Loading...
Latter-day-LR 950728Rone Engineers. Inc. Geotechnical Consultants Materials Testing REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: JOHN HORTON PROJECT: CHURCH OF JESUS CHRI.~T LATTER-DAY SAINTS REPORT DATE: 07/28/95 SAMPLE DATE: 07/27/95 OUR REPORT NO. D4251B-093 FIELD DATA: No of Concrete Water Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp NO Made Number Batched Unloaded Concrete (Gal) (In) (%) °F °F 54 4 427441 2:43 4:00 10 0 6 1/4 4.0 99 92 LOCATION: 54 RETAINING WALL - SOUTH WING REMARKS: TECHNICIAN: TIM DUKE ,Rone Engineers, Inc.