Latter-day-LR 950801Rone Engineers
Geotechnical Consultants
Materials Testing
BoneEn
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
IDate of Observation
JUNE 30, 1995
IPlrchase Order
RT ,o.t Date
D4251B-090
To
JOHN R. HORTON, ARCHITECT
Location
WEST SIDE SIDEWALK - 10' SOUTH OF SIDE ENTRANCE
Contractor
W. B. KIBLER CONSTRUCTION
Supplier
TXI
Mix Number
8273
Weather Conditions
Time Sampled
11:15 AM
Physical Data
IPlant I Truck
41 467
OVERCAST '
IWater Added
0.0 GALS
ACTUAL
SLUMP (in.) -- 5 1/4
ENTRAINED AIR (%) -- 4.5
Concrete Cylinder Test(s)
Mix Description
Ambient Temperature (°F)
90
ACTUAL
No. (Days) (lbs.)
51A 7 7/07~95 102000
51B 28 7/28~95 125000
51C 28 7/28~95 128000
51D HOLD HOLD
Curing Method I Test Method
ASTM C 31I ASTM C 39
Compressive
Strength (psi)
3610
4420
453O
4OO0
Remarks and/or Distribution
Standard 6" x 12" Engineer/Technician
Area 28.27 sq. in.
08/01/95
SPEC
SPEC
Stren,
Distribution: (1) -- JOHN R. HORTON
(1) -- W.B. KIBLER CO.NSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
LIMITATIONS: The teat remJIte preaented herein were prepared ba~d upon t.he ~pecifiC. eamplea prey' .~l~d. f.o.~ teating. We ~ n
quality (comp~ltion, af~pearer~e, perf~rmence, otc,} or Iny othe~ folturo of amll~ eubject matter provm~
O~ lo.em a~ rep~ Ire f~ t~ excl~ive ~ o; t~ ~en~ to w~ t~y ~e ~r~.
)ncrete Temperature (°F)
;IFICATIONS
;IFICATIONS
Ith Required (psi)
c:\wpwin\forms\cylinder.rpt-9 5/kjh
WAYNE SMITH
) re~ormibility for v~iatton in
over which we have no control.
August 1, 1995