Latter-day-LR 950801 (2)Reno Engineers
Geotechnical Consultants
Materials Testing
RoneEn ineers
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
IDate of Observation
JUNE 30, 1995
IPIrchase Order
R13ort Date
D4251B-091
To
JOHN R. HORTON, ARCHITECT
Location '
SOUTH SIDWALK AT MAIN ENTRANCE RAMP
Contractor
W. B. KIBLER CONSTRUCTION
Supplier
TXI
Mix Number
8273
Weather Conditions OVERCAST
Time Sampled
12:09 PM
IWater Added
0.0 GALS
I Plant I Truck
41 531
Mix Description
Ambient Temperature (°F)
90
08/01/95
)ncrete Temperature (°F)
Physical Data
ACTUAL SPE(;IFICATIONS
SLUMP (in.) -- 5
ENTRAINED AIR (%) -- 4.4
Concrete Cylinder Test(s)
ACTUAL SPE(:IFICATIONS
No. (Days) Test Date (lbs.) Strength (psi)
Stren
52A 7 7/07/95 99000
52B 28 7/28/95 111000
52C 28 7/28/95 113000
52D HOLD HOLD
Ith Required {psi)
3500 4000
3930
4000
Curing Method I Test Method
ASTM C 31I ASTM C 39
Remarks and/or Distribution
Standard 6" x 12" I Engineer/Technician
Area 28.27 sq. in.
I
Distribution: (1) --JOHN R. HORTON
(1) -- W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
LIMITATIONS: The teat rceult~ pre~nted herein were prepared baeed up~ t~. ~pecific. semplce pro¥' ..~1. foe tcetin9. We a#?~e.., m
quality Icompceitien, al~:~arance, performance, etc.} oe any ether feeture of mn~ar ~ub.~ct matter i~'evi~ted by I~er.~ oe condltl~
Out letter~ end rep~ ~4 f~ ~ excl~ive ~ of ~ clM~ to wh~ t~y ~e ~r~.
~ rcepoceibilit~ foe variation in
over which we have no coelt~'ol.
August 1, 1995
c:\wpwin\forms\c¥1inder.rpt-95/kjh
WAYNE SMITH