Loading...
Latter-day-LR 950801 (2)Reno Engineers Geotechnical Consultants Materials Testing RoneEn ineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number IDate of Observation JUNE 30, 1995 IPIrchase Order R13ort Date D4251B-091 To JOHN R. HORTON, ARCHITECT Location ' SOUTH SIDWALK AT MAIN ENTRANCE RAMP Contractor W. B. KIBLER CONSTRUCTION Supplier TXI Mix Number 8273 Weather Conditions OVERCAST Time Sampled 12:09 PM IWater Added 0.0 GALS I Plant I Truck 41 531 Mix Description Ambient Temperature (°F) 90 08/01/95 )ncrete Temperature (°F) Physical Data ACTUAL SPE(;IFICATIONS SLUMP (in.) -- 5 ENTRAINED AIR (%) -- 4.4 Concrete Cylinder Test(s) ACTUAL SPE(:IFICATIONS No. (Days) Test Date (lbs.) Strength (psi) Stren 52A 7 7/07/95 99000 52B 28 7/28/95 111000 52C 28 7/28/95 113000 52D HOLD HOLD Ith Required {psi) 3500 4000 3930 4000 Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution Standard 6" x 12" I Engineer/Technician Area 28.27 sq. in. I Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The teat rceult~ pre~nted herein were prepared baeed up~ t~. ~pecific. semplce pro¥' ..~1. foe tcetin9. We a#?~e.., m quality Icompceitien, al~:~arance, performance, etc.} oe any ether feeture of mn~ar ~ub.~ct matter i~'evi~ted by I~er.~ oe condltl~ Out letter~ end rep~ ~4 f~ ~ excl~ive ~ of ~ clM~ to wh~ t~y ~e ~r~. ~ rcepoceibilit~ foe variation in over which we have no coelt~'ol. August 1, 1995 c:\wpwin\forms\c¥1inder.rpt-95/kjh WAYNE SMITH