Lakeside V2-LR 960219 Maxim Tech. · Southwestern Labs
2575 Lone Star Dr. · P.O. Box 224227
Dallas. Texas 75222
T E C H N O L O G I E S I N C Telephone: (214) 631-2700
FAX: (214) 920-1891
REPORT OF
IN-PLACE DENSITY
CLIENT: TH;. K~OG~.R CO
Attn: Jeff Kruegar
100 Kroger Drive
Keller, TX 76248 PROJECT NO.: 0903506037
REPORT NO.: 37129A
PROJECT: Kroger ~448 DATE OF SERVICE: 2/09/96
AUTHORIZATION:
Coppell Tx. REPORT DATE: 2/19/96
SERVICES: Perform in-place density and moisture content tests to determine the degree
of field compaction.
PROJECT DATA MOISTURE/DENSITY RELATIONS
CONTRACTOR: David Christopher, Inc. OPTIMUM MAXIMUM
MATERIALS MOISTURE % DENSITY 13cf
TESTOF: Building Pad 36653 Red clay sand 13.0 117.5
METHOD OF TEST:
DENSITY: ASTM D2922 SPECIFICATION
MOISTURE: ASTM D3017 DENSITY: 95% Dry Density MOISTURE:-2% to +2% opt.
REPORT OF TESTS
FIELD OPTIMUM FIELD MAXIMUM
TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY
NO LOCATION (%) (%) (Pcf) (Pcf) (% max)
1. 40' W. & 90' S. of the N.E.
corner of building, 6th lift. 12.3 13.0 113.0 117.5 96
2. 40' W. & 50' S. of the N.E.
corner of building, 6th lift. 11.9 13.0 113.3 117.5 96
3. 100' W. & 50' S. of the N.E.
corner of building, 6th lift. 11.9 13.0 113.1 117.5 96
4. 100' W. & 90' S. of the N.E.
corner of building, 6th lift. 12.0 13.0 112.9 117.5 96
Test results on this report meet project
specifications as noted above.
Technician: Paul D. Butler Started: 09:30AM Stopped: ll:00AM
C.E.T.
Report Distribution: MAXIM TECH..SOUTHWESTERN LABS
(1) THE KROGER CO
(1) David Christopher,
(1) City of Coppe[[
II, CET
1OO7 JS
0u? I~rter$ ~d reports Me.fM the m(. clulive uee of the clle~t to whom they Me Ici~]rW