Loading...
Latter-day-LR 950807Rone Engineers Geotechnical Consultants Materials Testing RoneEngineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number I Date of Observation D4251B-094 I JULY 27, 1995 To JOHN R. HORTON, ARCHITECT Location RETAINING WALL - SOUTH WING Contractor W. B. KIBLER CONSTRUCTION IPlrchase Order Rlport Date 08/07/95 Supplier TXI I Plant I Truck 31 542 Mix Number Mix Description 8273 w/6011 PARTLY CLOUDY Weather Conditions IWater Added 0.0 GALS Ambient Temperature (°F) I C( 99 I 9; ncrete Temperature {°F) Time Sampled 3:40 PM Physical Data ACTUAL SPEC:IFICATIONS SLUMP (in.) -- 6 1/4 ENTRAINED AIR (%) -- 4.0 Concrete Cylinder Test(s) ACTUAL SPEC No. (Days) (lbs.) Strength (psi) 4OOO Stren 54A 7 8/03195 54B 28 8/24/95 54C 28 8/24/95 54D HOLD HOLD Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution 125000 4420 IStandard 6" x 12" Engineer/Technician Area 28.27 sq. in. Distribution: (1) -- JOHN R. HORTON (1) -- W.B. KIBLER CO_NSTRUCTION (lJ -- BILL FOWKES (1) -- CITY OF COPPELL UMITATIONS: The teet re~lt~ i~#ented herein were prepared b#ed ~ ~ ~c~ =~;~ ~o~ ~ t~fi~. We ~ m :IFICATIONS th Required (psi) c:~wp win\forms\cylinder.rpt-95/kjh TIM DU(E r~p~'t.ibility for va~ia~on in ovo~' which we have no August 7, 1995