Loading...
Lakeside V2-LR 960219 (3) Maxim Tech. · Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214! 631-2700 T E C H N O L O O I E S I N C FAX: (214) 920-1891 REPORT OF IN-PLACE DENSITY CLIENT: THE KROGER CO Attn: Jeff Kruegar 100 Kroger Drive Keller, TX 76248 PRO-~ECTNO.: 0903506037 REPORT NO.: 37080A PROJECT: Kroger ~448 DATE OF SERVICE: 2/08/96 AUTHORIZATION: John Coppell Tx. REPORT DATE: 2/19/96 SERVICES: Perform in-place density and moisture content tests to determine the degree of field compaction. PROJECT DATA MOISTURE/DENSITY RELATIONS CONTRACTOR: David Christopher, Inc. OPTIMUM MAXIMUM MATERIALS MOISTURE % DENSITY pcf TESTOF: Building pad 36653 Red clay sand 13.0 117.5 METHOD OF TEST: DENSITY: ASTM D2922 SPECIFICATION MOISTURE: ASTM D3017 DENSITY: 95% Dry Density MOISTURE:-2% to +2% opt. REPORT OF TESTS FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NO LOCATION (%) (%) (Pcf) {Pcf) (% max) 1. 40-' S. & 50' W. of the N.E. corner of building, 4th lift. 15.0 13.0 115.5 117.5 98 2. 40' S. & 85' W. of the N.E. corner of building, 4th lift. 13.4 13.0 111.6 117.5 95 3. 40' S. & 65' E. of the N.W. corner of building, 4th lift. 13.4 13.0 113.2 117.5 96 4. 90' S. & 35' E. of the N.W. corner of building, 4th lift. 13.6 13.0 111.7 117.5 95 Report Of Tests Continued On Page 2 1007 JS Our lettera and reportl Ma for the excluaive ule of the client to whom they Me oddre~led and ~hall not be reproduced except in full withmJt tim 8pprovid of the tearing let)oratory. The use of ourname must recmve our written approvli. Our letters IrKI reports M~pIy only to the simple teated ar, diM inipected, end Me not indicative of the quantitie~ of IppMefltly identical o~ simiior productl. THE KROGER CO REPORT NO. 37080A PROJECT NO. 0903506037 PAGE 2 DATE OF SERVICE: 2/08/96 REPORT OF TESTS ¢co. Hin~) FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NO LOCATION (%) (%) (Pcf) (Pcf) (% max) 5. 90' S. & 100' E. of the N.W. corner of building, 4th lift. 15.3 * 13.0 114.5 117.5 97 6. 90' S. of 10' W. of the N.M. corner of building, 4th lift. 13.6 13.0 111.9 117.5 95 7. Dock area, 4th lift. 14.0 13.0 112.7 117.5 96 An asterisk (*) appears next to test results which do NOT meet the project specifications as noted on page 1. Technician: Paul D. Butler Started: 07:30AM Stopped: 09:30AM C.E.T. Report Distribution: MAXIM TECH. ~SOUTHWESTERN LABS (1) THE KROGER CO ~ -~- (1) David Christopher, Inc. (1) City of CoppeJ[ Arthur E I, CET 1007 JS Our Iottem and report~ are for the exclusive t~e of the client to whom they are ecl~lreaeed ~ ~heil not be reproduced excel~t in full w:thout the a~proval of the te~ting laboratory. The u~e of surname mu~t rocewe our written ~oproval. Ou~ letter, and reports ~ol~y only to the sample te~ted Ind/or inlpected, end I~e not indiclt:ve of the qulrttitie~ of II,patently identical or aimila~ products.