Loading...
Lakeside V2-LR 960219 (4) Maxim Tech. · Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 T E C H N O L O G I E S I N C FAX: (214) 920-1891 REPORT OF IN-PLACE DENSITY CLIENT: TX~ ]~OO~.R CO Attn: Jeff Kruegar 100 Kroger Drive Keller, TX 76248 PROJECT NO.: 0903506037 REPORT NO.: 37022 PROJECT: Kroger #448 DATE OF SERVICE: 2/07/96 AUTHORIZATION: John Coppell Tx. REPORT DATE: 2/19/96 SERVICES: Perform in-place density and moisture content tests to determine the degree of field compaction. PROJECT DATA MOISTURE/DENSITY RELATIONS CONTRACTOR: David Christopher, Inc. OPTIMUM MAXIMUM MATERIALS MOISTURE % DENSITY ocr TEST OF: Building pad 36653 Red clay sand 13.0 117.5 ..... 35461 Light brcwn clay sand 12.0 121.5 with gravel. METHOD OF TEST: DENSITY: ASTM D2922 SPECIFICATION MOISTURE: ASTM D3017 DENSITY: 95% Dry Density MOISTURE:-2% to +2% opt. REPORT OF TESTS FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NO LOCATION (%) (%) (Pcf) (Pcf) (% max) 1. 15' S. & 15' W. of the N.E. corner of building, 3rd lift. 12.1 13.0 112.2 117.5 95 2. 15' S. & 100' W. of the N.E. corner of building, 3rd lift. 11.5 13.0 112.0 117.5 95 3. 25' S. & 50' E. of the N.W. corner of building, 3rd lift. 12.0 13.0 111.8 117.5 95 4. 65' S. & 10' W. of the N.E. corner of building, 3rd lift. 13.5 13.0 114.4 117.5 97 Report Of Tests Continued On Page 2 1007 JS Our lettml and reportz are fro' the exclulive ule of the client to whom they a,~ addressed and tall r~t be reproduced excel~t in full without the el~oroval of the tearing laboratory. The ule of. ou..r., name roue! reCelV~ ~ur written apathy?..uur, letting, and re.por~ TH;. KROGER CO REPORT NO. 37022 PROJECT NO. 0903506037 PAGE 2 DATE OF SERVICE: 2/07/96 REPORT OF TESTS (Continued) FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NO LOCATION (%] [%) (Pcf) (Pcf) (% max) 5. 75' S. & 75' W. of the N.E. corner of building, 3rd lift. 13.2 13.0 111.9 117.5 95 6. 100' S. & 15' E. of the N.W. corner of building, 3rd lift. 11.0 13.0 111.7 117.5 95 7. Dock area, 3rd lift. 11.6 13.0 111.9 117.5 95 Test results on this report meet project specifications as noted on page 1. Technician: Paul D. Butler Started: 11:30AM Stopped: 01:30PM C.E.T. Report Distribution: MAXJM TFCH. ~O~THWESTERN LABS ( 1 ) THE KROGER CO ,. (1) David Christopher, Inc. (1) City of Coppe[[ Arthur B~herl~III, CET 1007 JS Our letters and reports ~re for the exclusive u~ of the client to whom they we ~ddrel~ed and ~hell not be reproduced except in