Loading...
Latter-day-LR 950825Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LA'i-rER-DAY SAINTS : oneEn ineers Number IDate of Observation JULY 27, 1995 08/25/95 D4251B-094 To JOHN R~ HORTON, ARCHITECT Location RETAINING WALL - SOUTH WING IPlrchase Order Rlport Date Contractor W. B, KIBLER CONSTRUCTION Supplier TXI IPlant I Truck 31 542 Mix Number 8273 w/6011 Mix Description Weather Conditions PARTLY CLOUDY Time Sampled 3:40 PM Water Added 0.0 GALS Physical Data ACTUAL SLUMP (in.) -- 6 1/4 ENTRAINED AIR (%) -- 4.0 Concrete Cylinder Test(s) ACTUAL Specimen I Age No. (Days) I Test Date I Tot Load (lbs.) 54A 7 8/03/95 54B 28 8/24/95 54C 28 8/24/95 54D HOLD HOLD Ambient Temperature (°F) 99 SPEC SPEC ICc ncrete Temperature (°F) 92 IFICATIONS Curing Method I Test Method ASTMC31 'I ASTMC39 Remarks and/or Distribution Compressive Strength (psi) Distribution: (1) -- JOHN R. HORTON IFICATIONS 125000 148000 153000 4420 4000 5240 5410 IStandard 6" x 12" Area 28.27 sq. in. (1) -- W.B. KIBLER CO,NSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL IEngineer/Technician Strength Required (psi) c:\wp win\forms\cylinder.rpt-95/kjh L MITATIONS: The tilt relultl pr#e~ted herein were prepared baled u~en the .I, pecifi~, elmpl# provid.~, foe telting, We Ill~.?....e no qullity (c~mpoliti~n, ipp~lrerlce, I~'mlnc~, etc.) ~' iny ether feature ~f eiml ar ~able~t m4tt~ provided by pereonl ~1' co~l~l~Jl~llll i Ou~ letterl end repe~t~ ere fer the exclusive ule of the clientl to where they er® iddre#ed. reef~omibility for variation in which wi have no centrel. August 25, 1995 TIM DUI;E