Latter-day-LR 950825Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LA'i-rER-DAY SAINTS
: oneEn ineers
Number
IDate of Observation
JULY 27, 1995
08/25/95
D4251B-094
To
JOHN R~ HORTON, ARCHITECT
Location
RETAINING WALL - SOUTH WING
IPlrchase Order
Rlport Date
Contractor
W. B, KIBLER CONSTRUCTION
Supplier
TXI
IPlant I Truck
31 542
Mix Number
8273 w/6011
Mix Description
Weather Conditions
PARTLY CLOUDY
Time Sampled
3:40 PM
Water Added
0.0 GALS
Physical Data
ACTUAL
SLUMP (in.) -- 6 1/4
ENTRAINED AIR (%) -- 4.0
Concrete Cylinder Test(s)
ACTUAL
Specimen I Age
No. (Days)
I Test Date I Tot Load
(lbs.)
54A 7 8/03/95
54B 28 8/24/95
54C 28 8/24/95
54D HOLD HOLD
Ambient Temperature (°F)
99
SPEC
SPEC
ICc ncrete Temperature (°F)
92
IFICATIONS
Curing Method I Test Method
ASTMC31 'I ASTMC39
Remarks and/or Distribution
Compressive
Strength (psi)
Distribution:
(1) -- JOHN R. HORTON
IFICATIONS
125000
148000
153000
4420 4000
5240
5410
IStandard 6" x 12"
Area 28.27 sq. in.
(1) -- W.B. KIBLER CO,NSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
IEngineer/Technician
Strength Required (psi)
c:\wp win\forms\cylinder.rpt-95/kjh
L MITATIONS: The tilt relultl pr#e~ted herein were prepared baled u~en the .I, pecifi~, elmpl# provid.~, foe telting, We Ill~.?....e no
qullity (c~mpoliti~n, ipp~lrerlce, I~'mlnc~, etc.) ~' iny ether feature ~f eiml ar ~able~t m4tt~ provided by pereonl ~1' co~l~l~Jl~llll i
Ou~ letterl end repe~t~ ere fer the exclusive ule of the clientl to where they er® iddre#ed.
reef~omibility for variation in
which wi have no centrel.
August 25, 1995
TIM DUI;E