Loading...
Latter-day-LR 950902Rone Engineers, Inc. Geotechnical Consultants Materials Testing REPORT OF FIELD INSPECTION OF CONCRETE [ oneEng 55 EAST SIDE - SIDE WALK REMARKS: TECHNICIAN: BOBBY RAY Rone Engineers, Inc.. / TESTED FOR: JOHN HORTON PROJECT: CHURCH OF JESUS CHRIST LATTER-DAY SAINTS REPORT DATE: 09/02/95 SAMPLE DATE: 08~28~95 OUR REPORT NO. D4251B-095 / / FIELD DATA: No of Concrete Water ~ Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump / Content Temp Temp No Made Number Batched Un;o;~ed C~[e~e (Gl;I) (l~) (%) °F °F 55 4 444684 8:00 5.0 88 90 LOCATION: