Loading...
WA9302-LR 951205'EOTECHNICAL E GEE Consultants, Inc. E I NVIRONMENTAL 2540 Glenda Lane · Suite ]08 · Dallas, Texas 75229 · (2]4) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: December 5, 1995 Date Concrete Placed: October 27, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 39 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Piers K-6, L-6, N-5, J-6, M-5 and H-5 MATERIALS ~°~' ~ ~' INSPECTION DATA Description (Lbs./Cu .Yd) Mix Number: 686 Time Sample Bateheal: 9:05 am Cement: Time Sampled: 10:00 am Fly Ash: Sample Location: Pier No. K-6 Truck/Ticket No: 189/13525 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 65°F Fine Aggregate: Concrete Range: 60°F Admixtures: Slump Range (inches): Weather Conditions: Sunny 1 Time Started: 7:08 am 2 Time Completed: 3:45 pm Added Water: Sample ALr Content (%): No Test Total Cubic Yards Placed: 7.75 C.Y. Requh'ed Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressire Strength Remarks Number Slump (in.) (Days) Test~l (Lbs.) (Lbs./Sq. In.) CWT 157 5V2" 7 11/03/95 125,740 4,450 CWT 158 5V2" 7 11/03/95 116,940 4,140 CWT 159 5~h" 28 11/24/95 146,780 5,190 CWT 160 5~/~" 28 11/24/95 149,900 5,300 Test Methods Utilized Fracture Regular Cyihders Made By: T.G. ASTM C-31,C-39,C-143 (Unless Noled Otherwise) Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea Mr. Gary Herron - RediMix Concrete ~~, GmE Coneultants, Inc. Reviewed by: