Loading...
Latter-day-LR 950912Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number D4251 B-096 To JOHN R. HORTON, ARCHITECT Location EAST SIDE - SIDE--~NALK Contractor W. B. KIBLER CONSTRUCTION Mix Number 8273 Date of Observation AUGUST 28, 1995 Fa oneEn gineers Plrchase Order RT ,om Date TXI 31 415 4~t4684 I Mix Description Weather Conditions CLEAR Time Sampled I Water Added 9:00 AM I 10.0 GALS Ambient Temperature (°F) 88 09/12/95 IC,)ncrete Temperature (°F) 9{) Physical Data ACTUAL SPE(:IFICATIONS SLUMP (in.) -- 5 ENTRAINED AIR (%) -- 5.0 ~oncrete Cylinder Test(s) ACTUAL No. (Days) (lbs.) Strength (psi) 55A 7 9/04/95 79000 55B 28 9/25/95 55C 28 9/25/95 55D HOLD HOLD 2790 Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution 4000 SPE( IStandard 6" x 12" Engineer/Technician Area 28.27 sq. in. Stren Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CQNSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS;: The reit relultl prelented herein were prepared bleed upem. t~. quality {compelition, ~;~pear~, performance, etc.) or any other feature er am. ar lUOleCt Our lettere and repoca are for the exclusive u~e of the clienm to whom they are eddre~md. :IFICATIONS th Required (psi) · r#l~neibilky for variation in over which we here no comrol. September 12, 1995 c:\wp win\forms\cylinder.rpt-95/kjh BOBBY RAY