Latter-day-LR 950915Rone Engineers
Geotechnical Consultants
Materials Testing
RoneEngineers
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number I Date of Observation
D4251B-098I SEPTEMBER 1, 1995
To
JOHN R. HORTON, ARCHITECT
Location
McARTHUR ROAD PAVING REPLACEMENT NORTH OF ENTRY DRIVE
IPlrchase Order
Rlport Date
09/15/95
Contractor
W. B. KIBLER CONSTRUCTION
Supplier Plant I Truck
TXI 41 I 382
Mix Number
8273
Weather Conditions CLEAR
Mix Description
Ambient Temperature (°F) I C¢
96 I 9z
Time Sampled I Water Added
3:00 PM I 0.0 GALS
,ncrete Temperature (°F)
Physical Data
ACTUAL SPEC:IFICATIONS
SLUMP (in.) -- 5 1/4
ENTRAINED AIR (%) -- 4.6
Concrete Cylinder Test(s)
ACTUAL SPEC:IFICATIONS
No. (Days) (lbs.) Strength (psi)
113000 4000
4000
Stren
56A 7 9~8/95
56B 28 9/29/95
56C 28 9/29195
56D HOLD HOLD
Curing Method Test Method Standard 6" x 12" Engineer/Technician BOBBY ~AY
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Remarks and/or Distribution
Distribution:
(1)--JOHN R. HORTON
(1) -- W.B. KIBLER CO, NSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
UMITATION$: The te~t reeult~ preeented h~rein were prepar~ b~ up~ t~ e~fi~ e~p~ prov~ f~ t~ti~. We ~ m
qu~ity (c~p~fion, ap~, ~orman~, etc.) or ~y ot~r t~t~e of ~milM ~e~ miner ~ov~ by ~o~ or c~tm~
O~ I~em a~ repo~l ~e for t~ ~cl~ve ~ of t~ clie~ to w~m t~y ~ ~r~.
c:\wpwin\forms\cylinder.rpt-9 5/kjh
th Required (psi)
re~onelbiltty for variitien in
which we have no comra4.
September 15, 1995