Loading...
Latter-day-LR 950915Rone Engineers Geotechnical Consultants Materials Testing RoneEngineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number I Date of Observation D4251B-098I SEPTEMBER 1, 1995 To JOHN R. HORTON, ARCHITECT Location McARTHUR ROAD PAVING REPLACEMENT NORTH OF ENTRY DRIVE IPlrchase Order Rlport Date 09/15/95 Contractor W. B. KIBLER CONSTRUCTION Supplier Plant I Truck TXI 41 I 382 Mix Number 8273 Weather Conditions CLEAR Mix Description Ambient Temperature (°F) I C¢ 96 I 9z Time Sampled I Water Added 3:00 PM I 0.0 GALS ,ncrete Temperature (°F) Physical Data ACTUAL SPEC:IFICATIONS SLUMP (in.) -- 5 1/4 ENTRAINED AIR (%) -- 4.6 Concrete Cylinder Test(s) ACTUAL SPEC:IFICATIONS No. (Days) (lbs.) Strength (psi) 113000 4000 4000 Stren 56A 7 9~8/95 56B 28 9/29/95 56C 28 9/29195 56D HOLD HOLD Curing Method Test Method Standard 6" x 12" Engineer/Technician BOBBY ~AY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Remarks and/or Distribution Distribution: (1)--JOHN R. HORTON (1) -- W.B. KIBLER CO, NSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL UMITATION$: The te~t reeult~ preeented h~rein were prepar~ b~ up~ t~ e~fi~ e~p~ prov~ f~ t~ti~. We ~ m qu~ity (c~p~fion, ap~, ~orman~, etc.) or ~y ot~r t~t~e of ~milM ~e~ miner ~ov~ by ~o~ or c~tm~ O~ I~em a~ repo~l ~e for t~ ~cl~ve ~ of t~ clie~ to w~m t~y ~ ~r~. c:\wpwin\forms\cylinder.rpt-9 5/kjh th Required (psi) re~onelbiltty for variitien in which we have no comra4. September 15, 1995