Loading...
Latter-day-LR 950915 (2)Rone Engineers Geotechnical Consultants Materials Testing RoneEngineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number I Date of Observation D4251 B-096 I AUGUST 28, 1995 To JOHN R. HORTON, ARCHITECT IPlrchase Order Rlport Date 09/15195 Location EAST SIDE - SIDEWALK Contractor W. B. KIBLER CONSTRUCTION Supplier Plant I Truck I Ti{;ket TXI 31 415 J 4~4684 Mix Number Mix Description / 8273 Weather Conditions CLEAR Time Sampled I Water Added 9:00 AM I 10.0 GALS Ambient Temperature (°F) 88 IC(,ncrete Temperature (°F) 9(~ Physical Data ACTUAL SPE£:IFICATIONS SLUMP (in.) -- 5 ENTRAINED AIR (%) -- 5.0 Concrete Cylinder Test(s) ACTUAL S PE£ :1 FI CATIONS No. (Days) (lbs.) Strength (psi) 79000 2790 4OOO Stren 55A 7 9~4/95 55B 28 9/25/95 55C 28 9/25/95 55D HOLD HOLD IStandard 6" x 12" I Engineer/Technician Area 28,27 sq. in. BOBBY RAY Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution Distribution: (1) -- JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL UMITATIONS: The te~t ruuJt~ pr~t~d herein were prepared baaed upon the specific lample~ previded for teatine. We a#ume m quality (cornl~oeition, ipl~earance, performance, Itc.! er any other feature ef eimilar tubject matter provided by peraen, or coraitienl Our lattarl ara reportl are for the exclueive u~e of the ciiarltl to whom they are addre#ed. c:\wpwin\forms\cylinder.rpt-95/kjh th Required (psi) , re~penaibility for variation in over whigh we hive no ~ontroJ. September 15, 1995