Latter-day-LR 950915 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
RoneEngineers
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number I Date of Observation
D4251 B-096 I AUGUST 28, 1995
To
JOHN R. HORTON, ARCHITECT
IPlrchase Order
Rlport Date
09/15195
Location
EAST SIDE - SIDEWALK
Contractor
W. B. KIBLER CONSTRUCTION
Supplier Plant I Truck I Ti{;ket
TXI 31 415 J 4~4684
Mix Number Mix Description
/
8273
Weather Conditions CLEAR
Time Sampled I Water Added
9:00 AM I 10.0 GALS
Ambient Temperature (°F)
88
IC(,ncrete Temperature (°F)
9(~
Physical Data
ACTUAL SPE£:IFICATIONS
SLUMP (in.) -- 5
ENTRAINED AIR (%) -- 5.0
Concrete Cylinder Test(s)
ACTUAL S PE£ :1 FI CATIONS
No. (Days) (lbs.) Strength (psi)
79000 2790
4OOO
Stren
55A 7 9~4/95
55B 28 9/25/95
55C 28 9/25/95
55D HOLD HOLD
IStandard 6" x 12" I Engineer/Technician
Area 28,27 sq. in.
BOBBY RAY
Curing Method I Test Method
ASTM C 31I ASTM C 39
Remarks and/or Distribution
Distribution: (1) -- JOHN R. HORTON
(1) -- W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
UMITATIONS: The te~t ruuJt~ pr~t~d herein were prepared baaed upon the specific lample~ previded for teatine. We a#ume m
quality (cornl~oeition, ipl~earance, performance, Itc.! er any other feature ef eimilar tubject matter provided by peraen, or coraitienl
Our lattarl ara reportl are for the exclueive u~e of the ciiarltl to whom they are addre#ed.
c:\wpwin\forms\cylinder.rpt-95/kjh
th Required (psi)
, re~penaibility for variation in
over whigh we hive no ~ontroJ.
September 15, 1995