Loading...
WA9302-LR 951205 (2)I'"EOTECHNICALE I , GEE Consultants, Inc. E [NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: December 5, 1995 Date Concrete Placed: October 30, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 40 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Piers MATERIALS sou~ ~t~ ~. INSPECTION DATA Description (Lbs./Cu .Yd) Mix Number: 686 Time Sample Batched: 8:57 am Cement: Time Sampled: 9:30 am Sample Location: Pier No. N4 Fly Ash: Truck/Ticket No: 196/13614 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 55°F Fine Aggregate: Concrete Range: 58°F Slump Range (inches): 5V2 Admixtures: Weather Conditions: Rain 1 Time Started: 2 Time Completed: Added Water: 8 gal. Sample Air Content (%): No Test Total Cubic Yards Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compresslye Strength Remarks Number Sinrap (in.) (Days) Tested (Lbs.) (Lbs./Sq. In.) CWT 161 5%" 7 11/06/95 137,660 4,870 CWT 162 5~/~" 7 11/06/95 152,860 5,410 CWT 163 5'/~" 28 11/27/95 191,760 6,780 CWT 164 5~A" 28 11/27/95 188,140 6,660 Test Methods Utilized Fracttu'e Regular Cylh~ders Made By: P. Chen ASTM C-31,C-39,C-143 (Unie,ss Noted Otherwise) Remarks and/or DLstribution: co: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Fh~lea Mr. Gary Herron - RediMix Concrete (~~/~j & . GEE Consultants, Inc. Reviewed by: