Latter-day-LR 950929Rone Engineers
Geotechnical Consultants
Materials Testing
F oneEn
ineers
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
D4251 B-096
rDate of Observation
AUGUST 28, 1995
To
JOHN R. HORTON, ARCHITECT
Location
EAST SIDE - SIDEWALK
Contractor
W, B, KIBLER CONSTRUCTION
IPlrchase Order
Rlport Date
09/29/95
Supplier
TXI
IPlant I Truck
31 415
Mix Numbe~
8273
Mix Description
Weather Conditions CLEAR
Time Sampled
9:00 AM
Physical Data
IWater Added
10.0 GALS
ACTUAL
SLUMP (in.) -- 5
ENTRAINED AIR (%) -- 5.0
Concrete
Cylinder Test(s)
ACTUAL
Ambient Temperature (°F)
88
No. (Days) (lbs.) Strength (psi)
55A 7 9/04/95 79000 2790
55B 28 9/25/95 100000 3540'
55C 28 9/25/95 100000 3540*
55D 56 10/23/95
SPEC
SPEC
rncrete Temperature (°F)
:IFICATIONS
:IFICATIONS
4000
Stren
th Required (psi)
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Remarks and/or Distribution
*DOES NOT MEET PROJECT SPECIFICATIONS
Distribution: (1) --JOHN R. HORTON
(1) -- W.B. KIBLER CONSTRUCTION
(1) - BILL FOWl(ES
(1) -- CITY OF COPPELL
BOBBY
UMITATIONS: The te~t requite prmnted herein ware prepared baaed upon the ~pegiflo aarnl~ea provided f~ te~tir~. We aeeume m
qu'dity (Coml=ooltion, appearange, performance, otc.) or any other feature of aimilar aub~oct mattar provided by per,one or conditione
Out' lettore ~ roport~ are for the excluolve u~e of the cliant~ to whom they are eddre~med.
c:\wp win~forms\cylinder.rpt-95/kjh
RAY
~ re~onolbility for variation in
over which wa have no control.
September 29, 1995