Loading...
Latter-day-LR 950929Rone Engineers Geotechnical Consultants Materials Testing F oneEn ineers Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number D4251 B-096 rDate of Observation AUGUST 28, 1995 To JOHN R. HORTON, ARCHITECT Location EAST SIDE - SIDEWALK Contractor W, B, KIBLER CONSTRUCTION IPlrchase Order Rlport Date 09/29/95 Supplier TXI IPlant I Truck 31 415 Mix Numbe~ 8273 Mix Description Weather Conditions CLEAR Time Sampled 9:00 AM Physical Data IWater Added 10.0 GALS ACTUAL SLUMP (in.) -- 5 ENTRAINED AIR (%) -- 5.0 Concrete Cylinder Test(s) ACTUAL Ambient Temperature (°F) 88 No. (Days) (lbs.) Strength (psi) 55A 7 9/04/95 79000 2790 55B 28 9/25/95 100000 3540' 55C 28 9/25/95 100000 3540* 55D 56 10/23/95 SPEC SPEC rncrete Temperature (°F) :IFICATIONS :IFICATIONS 4000 Stren th Required (psi) ASTM C 31 ASTM C 39 Area 28.27 sq. in. Remarks and/or Distribution *DOES NOT MEET PROJECT SPECIFICATIONS Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION (1) - BILL FOWl(ES (1) -- CITY OF COPPELL BOBBY UMITATIONS: The te~t requite prmnted herein ware prepared baaed upon the ~pegiflo aarnl~ea provided f~ te~tir~. We aeeume m qu'dity (Coml=ooltion, appearange, performance, otc.) or any other feature of aimilar aub~oct mattar provided by per,one or conditione Out' lettore ~ roport~ are for the excluolve u~e of the cliant~ to whom they are eddre~med. c:\wp win~forms\cylinder.rpt-95/kjh RAY ~ re~onolbility for variation in over which wa have no control. September 29, 1995