Loading...
Latter-day-LR 951002Rone Engineers, Inc. Geotechnical Consultants Materials Testing REPORT OF FIELD INSPECTION OF CONCRETE Fa:oneEn ineers 57 PAVING REPAIR AT ENTRANCE, WALL OF N.W. SIDE OF ENTRANCE TO BUILDING & PORTION OF WEST SIDEWALK ALONG Mac ARTHUR BLVD. REMARKS: TECHNICIAN: CHUCK RAY Rone Engineers, Inc. TESTED FOR: JOHN HORTON PROJECT: CHURCH OF JESUS CHRI.~T LATTER-DAY SAINTS REPORT DATE: 10/02/95 SAMPLE DATE: 09/28/95 OUR REPORT NO. D4251B-099 FIELD DATA: No of Concrete Water Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Truck Yards of Added Slump Content Temp Temp No Made Number Batched Unloaded Concrete (Gal) (In) (%) °F °F 57 4 462936 2:21 10/30 20 4 5.8 86 90 LOCATION: