Latter-day-LR 951005Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
D4251B-098
IDate of Obse~ation
SEPTEMBER 1, 1995
To
JOHN R. HORTON, ARCHITECT
Location
McARTHUR ROAD PAVING REPLACEMENT NORTH OF ENTRY DRIVE
Contractor
W. B. KIBLER CONSTRUCTION
Supplier
IPlrchase Order
RI~ ,orr Date
TXI
Mix Number
8273
Weather Conditions CLEAR
Time Sampled
3:00 PM
Physical Data
I Plant I Truck
41 382
Mix Description
IWater Added
0.0 GALS
ACTUAL
SLUMP (in.) -- 5 1/4
ENTRAINED AIR (%) -- 4.6
Concrete Cylinder Test(s)
ACTUAL
Ambient Temperature (°F)
96
Specimen
No.
56A
56B
56C
56D
Age ITestDatel TotLoad
(Days) (lbs.)
7 9/08/95 113000
28 9/29/95 137500
28 9/29/95 133000
HOLD HOLD
Curing Method
ASTM C 31
Compressive
Strength (psi)
4000 4000
4860
4700
Test Method Standard 6" x 12" Engineer/TechniCian
ASTM C 39 Area 28.27 sq. in.
Remarks and/or Distribution
10/05/95
SPE£
,ncrete Temperature (°F)
:IFICATIONS
SPE(;:IFICATIONS
Stren
BOBBY
Distribution: (1) --JOHN R. HORTON
{1) -- W.B. KIBLER CONSTRUCTION
(1) -- BILL FOWKES
(1) -- CITY OF COPPELL
LIMITATIONS: The teat reault~ preaented herein were prepared baled ut)off ~ .a.I)ecific. eemple~ provid.~l, for testing. We eam~...e n
quality (compo~ition, appearance, ;)orformlnce, etc.} or any othe~' feature of Ilrndl~ lubject matter provided by porlonl or conalTJOnl
Ou~ lettem and reports are for the axcluaive use of the cliont~ to whom they ate addre~d.
;th Required (psi)
RAY
c:\wp win\forms\cylinder.rpt-95/kjh
~ reeponeibility for variation in
over which we have no control.
RoneEngineers
October 5, 19~1~