Loading...
Latter-day-LR 951005Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number D4251B-098 IDate of Obse~ation SEPTEMBER 1, 1995 To JOHN R. HORTON, ARCHITECT Location McARTHUR ROAD PAVING REPLACEMENT NORTH OF ENTRY DRIVE Contractor W. B. KIBLER CONSTRUCTION Supplier IPlrchase Order RI~ ,orr Date TXI Mix Number 8273 Weather Conditions CLEAR Time Sampled 3:00 PM Physical Data I Plant I Truck 41 382 Mix Description IWater Added 0.0 GALS ACTUAL SLUMP (in.) -- 5 1/4 ENTRAINED AIR (%) -- 4.6 Concrete Cylinder Test(s) ACTUAL Ambient Temperature (°F) 96 Specimen No. 56A 56B 56C 56D Age ITestDatel TotLoad (Days) (lbs.) 7 9/08/95 113000 28 9/29/95 137500 28 9/29/95 133000 HOLD HOLD Curing Method ASTM C 31 Compressive Strength (psi) 4000 4000 4860 4700 Test Method Standard 6" x 12" Engineer/TechniCian ASTM C 39 Area 28.27 sq. in. Remarks and/or Distribution 10/05/95 SPE£ ,ncrete Temperature (°F) :IFICATIONS SPE(;:IFICATIONS Stren BOBBY Distribution: (1) --JOHN R. HORTON {1) -- W.B. KIBLER CONSTRUCTION (1) -- BILL FOWKES (1) -- CITY OF COPPELL LIMITATIONS: The teat reault~ preaented herein were prepared baled ut)off ~ .a.I)ecific. eemple~ provid.~l, for testing. We eam~...e n quality (compo~ition, appearance, ;)orformlnce, etc.} or any othe~' feature of Ilrndl~ lubject matter provided by porlonl or conalTJOnl Ou~ lettem and reports are for the axcluaive use of the cliont~ to whom they ate addre~d. ;th Required (psi) RAY c:\wp win\forms\cylinder.rpt-95/kjh ~ reeponeibility for variation in over which we have no control. RoneEngineers October 5, 19~1~