· t.~'dr '~" AGENDA- AUGUST 16, 2001
BETtIEL ROAD (DALLAS/TARRANT COUNTY LINE TO FREEPORT ROAD)
CITY OF COPPELL, TEXAS
· Design Criteria 1. Roadway Classified C4D-Minor Arterial 4-Lane
2. Design Speed 50 mph
3. Right-of-Way - 90' with 110' at Intersections
4. Location of Median Openings
5. Typical Sections
Utilities.
1. Agreements between Coppell and utility compaules(phone, fiber optic, cable).
2. Existing easements .... GTE e~ement on east end of project?
3. Confirm existing utility compames
,- GTE
- MSN/CSD (Metromedia
- AT&T Local Services
- SWBT
- Touch America (fiber optic)-
- UG Television Cable
- General Telephone Company
/ - Explorer Pipeline ~-~-
- Southwest Inc. (cable)
- Gas
- Overhead Electric
4. Contacting utilities to verify thek locations and arrange for their relocation.
· Right-of-Way Requirements ~
· Easement Options (Assuming Proposed ROW as sh~ow'~: ?~ ~chen~,,t!c)s~ ~A~.~d)r~,,t~
~-4. Permanent Easements vs. Slope Easements
~ 2. Retaining Walls
3. Start Back-Slope at Curb
4. Match Existing Grade
· Drives/Box Culverts In Front of Post Office Processing Center 1. Remove portion of concrete wall (back 5' fi:om proposed curb)
2. Add perpendicular wing walls (out to top of concrete channel)
3. Add Guard Rail each side ofdrivefoox culverts
4. Proximity of edge of new pavement to existing concrete llne channel around Sta.
34+00 (down to approx. 15' of separation) ..... Guard Rail necessary?
Transition From Existing 2-Lane to New 4-Lane
1. At Dallas/Tm-rant County Line
2. At Freeport Road
Turn Lanes at Royal Lane and Freeport Road
Hydraulic Study
1. Agreement between Coppell & Grapevine for stormwater at west-end of project.
2. Existing Studies
3. Hydraulic Calculations for New Ponds
"Go By" Plans from City ofCoppell - ~
AGENDA EXHIBIT -AUGUST 16, 2001
BETHEL ROAD (DALLAS/TARRANT cOUNTY LINE TO FREEPORT ROAD)
CITY OF COPPELL, TEXAS
Easemem Options (Assuming ProPOsed ROW as shown on Schematic is Acquired)
1. Permanent Easements vs. Slope Easements
2. Retaining Walls
3. Start Back-Slope at Curb
4. Match Existing Grade
Stations:
0+00 to 4+50
4+50 to 5+00
5+00 to 10+00
10+00 to 15+00
15+00 to 16+50
16+50 to 18+00
18+00 to 19+00
19+00 to 23+50
23+00 to 25+00
25+00 to 27+50
27+50 to 29+85
29+85 to 30+70
30+70 to 31+50
31+50 to 33+00
33+00 to 34+50
34+50 to 39+00
39+00 to 42+50
42+50 to 44+00
44+00 to 48+00
48+00 to 52+00
52+00 to 54+00
54+00 to 58+50
58+50 to 60+00
60+00 to 64+00
North. South
ok 10' Slope Ease.
10' Slope Ease. 10' Slope Ease.
10' Slope Ease. 15' Slope Ease.
10' Slope Ease. 10' Slope Ease.
10' Slope Ease. 10' Slope Ease.
15' Slope Ease. 10' Slope Ease.
15' Slope Ease. 15' Slope Ease.
25' Slope Ease. or 15' Slope Ease.
2'- 4' Retain Wall
ok ok
1'- 2.5' Retain Wall ok
or Begin B-S ~ curb
20' Slope Ease. ok
Royal Lane Royal Lane
ok ok
10' Slope Ease. ok
or Begin B-S @ curb
ok Match Ex.Grade
10' Slope Ease. ok
or Begin B-S ~ Curb
or Match Ex. Grade
10' Slope Ease. ok
or Begin B-S ~ Curb
15' Slope Ease. ok
or Begin B-S ~ Curb
10' Slope Ease. ok
or Begin B-S ~ Curb
ok ok
5' Slope Ease. ok
or Begin B-S ~ Curb
10' Slope Ease. ok
or Begin B-S ~ Curb
10' Slope Ease 10' Slope Ease
or Begin B-S ~ Curb or Begin B-S ~ Curb
ok 10' Slope Ease.
or Begin B-S ~ Curb
MEETING MINUTES
AUGUST 16, 2001
BETHEL ROAD (DALLAS/TARRANT COUNTY LINE TO FREEPORT ROAD)
CITY OF COPPELL, TEXAS
Attendees:
Ken Griffin. P.E.
Teresa Turner
Susan Taylor
Paul Padilla, P.E.
Joe Masterson, P.E.
Craig Bond, P.E.
Mike Hobbs
City of Coppell - Director of Engineering
City of Coppell - Graduate Engineer
City of Coppell - ClP Coordinator
Transystems - Project Coordinator
TranSystems - Project Manager
TranSystems - Project Engineer
TranSystems - Project Hydrologist
Details of Meeting:
Design Criteria
· Ken met with Gerry/City of Grapevine who indicated that Bethel would be 6-lane fi.om 121 to
the Coppell. Ken to follow up with Jerry. TranSystems to proceed with design for 4-lane.
· Left turn lanes required at medians
· Median widths to be 16 ft
· Sandy Lake Road used 27 f~ back-to-back, including the bike lane
· Our typical section will be: 27 f~ back to back/16 ft median/27 ft back-to-back, for an over all
width of 70 f~.
· Plan for 5 ft sidewalks to be 1 ft from property line, or 2 ft from back of curb.
· Face of retaining walls no closer than 7 ft from back of curb
· Use 90ft for median openings
· Split pavement elevations are OK if necessary, do not exceed 1 ft difference
· Do not include City Detail Sheets in drawings unless different that standard details
Utilities
· Ken has list of permits issued for utility installation (phone, fiber optic and cable), he will
supply this list to TranSystems
· Most of the City agreements will require utilities to move their lines/structures in the event of
road widening, except for Explorer Pipeline
· City agreements may not apply to gas or overhead power transmission lines
· Added several entities (boided below) to list of existing utility companies that TranSystems
will be contacting to verify existing line locations
- GTE
- MSN/CSD (Metromedia)
AT&T Local Services
SWBT
Touch America (fiber optic)
UG Television Cable
Page 1 of 3
General Telephone Company
Explorer Pipeline
Southwest Inc. (cable)
Overhead Electric
Quest (going into Touch One's conduit)
AT & T Broadband
City of Grapevine
Right-of-Way Requirements
· There was considerable discussion related to the ROW requirements adjacent to the CICI's
Addition and the Gulf United Industries' Addition property. TranSystems will adjust the
roadway alignment to minimize the impacts to these properties. Of particular concern was the
newly established landscaping.
· East of Freeport Pkwy, acquire the entire 90 ft of ROW adjacent to the Duke-Freeport
Addition property.
Easements
· City uses permanent easements for drainage or ROW, "Letters of Permission" for changing
contour (cut or fill), and "Slope Easements" when sloped area is not functional for other uses
(City pays approx. 25% of property value for these situations)
· Ken talked about using slope easements between Sta. 19+00 and 21+50 (in fi.om of CICI's
building)
Drives w/Multi-Box Culverts In From of Post Office. Processing Center
Talked about options for adding perpendicular wing walls (out to the top of the concrete lined
channel) at the three drives w/multi-box culverts. Options included:
1. flush retaining wall with TXDOT-PRI handrails (painted gray or maybe galvanized
aluminum)
2. skip handrails and use short concrete walls to match existing architecture. No final
decision, TranSystems will investigate options. Ken emphasized the need for an aesthetic
solution.
Transitions From Existing 2-Lane to 4-Lane
· At G-rapevinedCoppel Line (Dallas/Tarrant Coumy Line) all of the transition to be in Coppdl
· At Freeport Road, transition to begin at Freeport and go approx. 400 ff to the east
Turn Lanes
· Show Turn Lanes at Royal Lane
· Show Turn Lanes at Freeport Road
Hydraulic Study
· TranSystems has completed the study of existing conditions and has obtained effective models
fi.om the US Army Corps of Engineers and FEMA.
· TranSystems requested design information for the ponds serving the new development north
~2~3
of Bethel Road. Ken will comact the design firms for these developments and obtain the
infommtion.
TranSystems will prepare a Stonnwater Routing Study to incorporate the existing ponds.
This study will be used to size a detention pond on airport property. Upon completion of the
Routing Study, TranSystems will schedule a meeting with the airport.
On the west-end of the project, the enclosed storm sewer will be extended to Cottonwood
Creek in Grapevine.
Status Repon
· TranSystems will prepare and submit a Project Status Report to Ken, Teresa and Susan every
two weeks.