Latter-day-LR 951114Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
PRIMCO CO. PHASE II
Number
3137-5060-029
IPt~rchase Order
RT )ort Date
To
CMPA
Location
SLAB LEAVE OUTS
IDate of Observation
10/05/95
Contractor
CMPA
Supplier
PIONEER
Mix Number
IPlant I Truck
Weather Conditions
Time Sampled
Physical Data
IWater Added
ACTUAL
Mix Description
Ambient Temperature (°F)
SLUMP (in.)
ITi
ICi
SPE(
11/14/95
;ket
~ncrete Temperature (°F)
:IFICATIONS
Concrete Cylinder Test(s)
ACTUAL SPE(:IFICATIONS
Compressive
Strength (psi)
No. (Days) (lbs.)
6A 7 10/12/95 102000
6B 28 11/02/95 128000
6C 28 11/02/95 132000
6D HOLD HOLD
Stren
rth Required (psi)
3610 3000
453O
4670
Curing Method Test Method Standard 6" x 12" Engineer/Technician CO~ITRACTOR
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Remarks and/or Distribution
Distribution:
(1) --CMPA
iMITATIONS: The teat reeult~ preeented herein we~e prepared baeed u~en the e~:ific ~enple~ provided fe~
al~eerence, i~fermance, etc.) er any other foettxo of ~imil,~ ~J~eCt rnatt~ provided by per,one er c~nditien~ over which we have ne contrN.
ef the clie~ta to when1 they are addre~d.
v~i~i~n in qu~ity
and ret=~l~ are fe~ the exclusive u#
RoneEngineers