Loading...
Latter-day-LR 951114Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project PRIMCO CO. PHASE II Number 3137-5060-029 IPt~rchase Order RT )ort Date To CMPA Location SLAB LEAVE OUTS IDate of Observation 10/05/95 Contractor CMPA Supplier PIONEER Mix Number IPlant I Truck Weather Conditions Time Sampled Physical Data IWater Added ACTUAL Mix Description Ambient Temperature (°F) SLUMP (in.) ITi ICi SPE( 11/14/95 ;ket ~ncrete Temperature (°F) :IFICATIONS Concrete Cylinder Test(s) ACTUAL SPE(:IFICATIONS Compressive Strength (psi) No. (Days) (lbs.) 6A 7 10/12/95 102000 6B 28 11/02/95 128000 6C 28 11/02/95 132000 6D HOLD HOLD Stren rth Required (psi) 3610 3000 453O 4670 Curing Method Test Method Standard 6" x 12" Engineer/Technician CO~ITRACTOR ASTM C 31 ASTM C 39 Area 28.27 sq. in. Remarks and/or Distribution Distribution: (1) --CMPA iMITATIONS: The teat reeult~ preeented herein we~e prepared baeed u~en the e~:ific ~enple~ provided fe~ al~eerence, i~fermance, etc.) er any other foettxo of ~imil,~ ~J~eCt rnatt~ provided by per,one er c~nditien~ over which we have ne contrN. ef the clie~ta to when1 they are addre~d. v~i~i~n in qu~ity and ret=~l~ are fe~ the exclusive u# RoneEngineers