Loading...
Latter-day-LR 951114 (2)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS Number D4251B-102 IDate of Observation OCTOBER 11, 1995 To JOHN R. HORTON, ARCHITECT Location DUMPSTER PAD Contractor W. B. KIBLER CONSTRUCTION IPlrchase Order Rlport Date 11/14/95 Supplier I Plant I Truck Mix Description Mix Number Weather Conditions Ambient Temperature Time Sampled I Water Added I Physical Data ITiCket .ncrete Temperature (°F) ACTUAL SPE(:::IFICATIONS SLUMP (in.) -- ENTRAINED AIR (%) -- Concrete Cylinder Test(s) ACTUAL SPE(::IFICATIONS Stren No. (Days) (lbs.) Strength (psi) 58A 20 11/01/95 102000 3610 58B 28 11/08/95 132000 4670 58C 28 11/08/95 104000 3670 58D HOLD HOLD th Required (psi) 3OOO Curing Method Test Method ASTM C 31 ASTM C 39 Remarks and/or Distribution IStandard 6" x 12" I Engineer/Technician Area 28.27 sq. in. CONTR~ Distribution: (1) -- JOHN R. HORTON (1) - W.B. KIBLER CONSTRUCTION (1) - BILL FOWKES (1) -- CITY OF COPPELL UMITATIONS: The teet r~ultl preeented herein w~e prepped be~d upon the ~pecific ~ample~ provided for te~ting. We ~ m quality (c~'nl~eition. al~earance, i~'ormence, etc.} o~ any other feature of ,imil~ eub~ct matter provided by per,no or condifionl Ou~ lettem and re~o~ are far the exclusive u# of the clienm to whom they me addr#aed. c:\wp win\forms\cylinder.rpt-95/kjh ~CTOR re~onoibility fo~ variation in ever which we have no compel. Rone Engineers November 14, 1