Latter-day-LR 951114 (2)Rone Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project
CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
Number
D4251B-102
IDate of Observation
OCTOBER 11, 1995
To
JOHN R. HORTON, ARCHITECT
Location
DUMPSTER PAD
Contractor
W. B. KIBLER CONSTRUCTION
IPlrchase Order
Rlport Date
11/14/95
Supplier I Plant I Truck
Mix Description
Mix Number
Weather Conditions Ambient Temperature
Time Sampled I Water Added
I
Physical Data
ITiCket
.ncrete Temperature (°F)
ACTUAL SPE(:::IFICATIONS
SLUMP (in.) --
ENTRAINED AIR (%) --
Concrete Cylinder Test(s)
ACTUAL SPE(::IFICATIONS
Stren
No. (Days) (lbs.) Strength (psi)
58A 20 11/01/95 102000 3610
58B 28 11/08/95 132000 4670
58C 28 11/08/95 104000 3670
58D HOLD HOLD
th Required (psi)
3OOO
Curing Method Test Method
ASTM C 31 ASTM C 39
Remarks and/or Distribution
IStandard 6" x 12" I Engineer/Technician
Area 28.27 sq. in.
CONTR~
Distribution: (1) -- JOHN R. HORTON
(1) - W.B. KIBLER CONSTRUCTION
(1) - BILL FOWKES
(1) -- CITY OF COPPELL
UMITATIONS: The teet r~ultl preeented herein w~e prepped be~d upon the ~pecific ~ample~ provided for te~ting. We ~ m
quality (c~'nl~eition. al~earance, i~'ormence, etc.} o~ any other feature of ,imil~ eub~ct matter provided by per,no or condifionl
Ou~ lettem and re~o~ are far the exclusive u# of the clienm to whom they me addr#aed.
c:\wp win\forms\cylinder.rpt-95/kjh
~CTOR
re~onoibility fo~ variation in
ever which we have no compel.
Rone Engineers
November 14, 1