Concrete Cylinder Test Report
Project
PRIMCO CO. PHASE II
IP~rchase Order
Re~ort Date
Number
3137-5060-032
Date of Observation
10/16/95
11/16195
To
CMPA
Location
WEST AND SOUTH BUILDING PERIMETER SIDEWALK
Contractor
CMPA
Supplier
PIONEER
Mix Number
9339
Weather Conditions
IPlant
19
Mix Description
ITruck
96
Ambient Temperature (°F)
JTk
39
Time Sampled
10:45 AM
Physical Data
CLEAR
JWater Added
10.0 GALS
76
ACTUAL
SLUMP (in.) 5 1/2
ENTRAINED AIR (%) -- 5.2
Concrete Cylinder Test(s)
ACTUAL
Specimen J Age J
No. (Days) Test Date
8A 7 10/23/95
8B 28 11/13/95
8C 28 11/13/95
8D HOLD HOLD
SPEC
Tot Load
(lbs.)
Compressive
Strength (psi)
90000 3180
97000 343O
105000 3710
35OO
SPEC
Curing Method Test Method Standard 6" x 12"
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Remarks and/or Distribution
Engineer/Technician
Distribution:
(1) --CMPA
Streng
UMITATIONS: The t~ reeuita preeented herein were prepored baeed upon the ~ecific samplee providecJ for ;.~;.;i,~. We
~peor~nce, performance, etc.) ~ ~ ot~ flM~l of ~milE J~e~ m~ ~ev~ by ~m~ ~ co~i~ ov~ w~ we h~ no c~.
C:\wp win\forms\cylinder.rpt-95/kjh
;ket
2038
ncrete Temperature (°F)
IFICATIONS
IFICATIONS
th Required (psi)
,y
Jori in quality (compeeition,
r ~ · and report~ are for the exgluaive u#
Rone Engineers
November 16, 19~JIBIIIIm