Loading...
Latter-day-LR 951116 (2)Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project PRIMCO CO. PHASE II Number IDate of Observation 10/16~95 IPlrchase Order Rlport Date 3137-5060-031 To CMPA Location S. W. PARKING LOT FROM SOUTH CURB TO 10'N & 10'W OF EAST SIDE OF POUR TO 20' WEST Contractor CMPA Supplier Plant I Truck I Ti, PIONEER 19 Mix Number 9339 Weather Conditions CLEAR IMix Description Ambient Temperature (°F) 76 11/16/95 :ket ~2022 ,ncrete Temperature (°F) i Time Sampled Water Added 8:45 AM 10.0 GALS Physical Data ACTUAL SPEC:IFICATIONS SLUMP (in.) 6 ENTRAINED AIR (%) -- 5.2 Concrete Specimen No. Cylinder Test(s) Age (Days) ACTUAL Test Date Tot Load Compressive {lbs.) SPEC:IFICATIONS Stren th Required (psi) 3500 Strength (psi) CHI 7A 78 7C 7D Curing Method ASTM C 31 7 10/23/95 92000 3250 28 11/13/95 101000 3570 28 11/13/95 98000 3400 HOLD HOLD Test Method Standard 6" x 12" Engineer/Technician ASTM C 39 Area 28.27 sq. in. Remarks and/or Distribution Distribution: (1) --CMPA ICK RAY .IMITATIONS.' The teat r~ult~ i~eaented herein were ixepared baaed u~on the ~ecific ~nplea ix~vided a~l~arance, i~rf~rmance, etc.) er any ether feature of ~imil~ subject mettet provided by i~er~ene e~ cenditi~ne over which we have ne c~ntr~d. ~f the c~ to whom they are eddreeaed. c:\wpwin\forms\cylinder.rpt-95/kjh ~ letter~ ancl mf)ert~ are fer the exclueive use