Loading...
Latter-day-LR 951102Rone Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Project CHURCH OF JESUS CHRIST OF LAI-i'ER-DAY SAINTS Number D4251B-100 IDate of Obse~ation SEPTEMBER 28,1995 IP~chase Order RTo~ Date 11/02/95 To JOHN R. HORTON, ARCHITECT Location PAVING REPAIR AT ENTRANCE, WALL AT N.W. SIDE OF ENTRANCE TO BLDG & PORTION OF W SIDEWALK Contractor W. B. KIBLER CONSTRUCTION Supplier TXI Mix Number 8273 41 467 I 4(~2936 Mix Description / Weather Conditions PARTLY CLOUDY Time Sampled Water Added 3:00 PM 20.0 GALS Physical Data ACTUAL SLUMP (in.) -- 4 ENTRAINED AIR (%) -- 5.8 Ambient Temperature (°F) 86 Concrete Cylinder Test(s) ACTUAL No. (Days) (lbs.) 57A 7 10/05/95 57B 28 10/26/95 57C 28 10/26/95 5~7D HOLD HOLD Compressive Strength (psi) Curing Method I Test Method ASTM C 31I ASTM C 39 Remarks and/or Distribution 90000 3180 133000 4700 121000 4280 SPEC SPEC ICencrete Temperature (°F) 9C Streng 4000 IStandard 6" x 12" I Engineer/Technician Area 28.27 sq. in. IFICATIONS IFICATIONS th Required (psi) Distribution: (1) --JOHN R. HORTON (1) -- W.B. KIBLER CONSTRUCTION {1) -- BILL FOWl<ES (1) -- CITY OF COPPELL L MITATIONS: The teat reeult~ preeented herein wore prepared baaed upon t.he ~gecific..amplee provid.efl, for ta~ttng. We ae~..m.e ne quality (compmitio~, eppelrm, performance, ate,) or ony othor feature of amdor lubject matter provided by per,one or cone t one Our le~em ond report~ ore for the exckmive u~e of the client~ to whom they are ~ddrea~. c:\wpwin\forms\cylinder.rpt-95/kjh CHUCK RAY re~por~ibility for variation in which we hive FIO control. RoneEngineers November 2, 1~1~