Loading...
Lakeside V2-LR 960130 Maxim Tech. e Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF IN-PLACE DENSITY CLIENT: THE KROGER CO Attn: Michael Roaas 100 Kroger Drive Keller, TX 76248 PROOECTNO.: 0903506037 REPORT NO.: 36454 PROJECT: Kroger DATE OF SERVICE: 1/22/96 AUTHORIZATION: REPORT DATE: 1/30/96 SERVICES: Perform in-place density and moisture content tests to determine the degree of field compaction. PROJECT DATA MOISTURE;qDENSITY RELATIONS CONTRACTOR: David Christopher, Inc. OPTIMUM MAXIMUM MATERIALS MOISTURE % DENSITY, pcf TEST OF: Building Pad 36371A-Reddish brown silty 13.5 116.5 sandy clay w/ iron ore frag. METHOD OF TEST: DENSITY: ASTM D2922 SPECIFICATION MOISTURE: ASTM D3017 DENSITY: 95% DRY DENSITY MOISTURE: +_ 2% opt moist REPORT OF TESTS FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NO LOCATION (%) (%~ (Pcfl (Pc~ ~% maxi 1. 30' South & 10' west of the northeast conrer, second lift 10.9 * 13.5 109.4 116.5 94 * 2. 60' South & 10' west of the northeast corner, second lift 13.4 13.5 110.9 116.5 95 2. 30' South & 10' west of the northeast corner, first lift 13.5 13.5 l!O.a 116.5 95 4. 60' South & i0' west of the northeast corner, first lift 13.6 13.J = !i0.~ 116.5 95 Report Of Tests Continued On Page 2 1007 LW Our letters and reports are for the exclusive use of the client to whom they are adaressed and shall not be reproduced except in fu~l without the approval of the testincJ labcratory. The use of ourname must receive our w.tten approval. Our letters and reoorts amply only to the sample tested and/Or inscectei:l, and are not inclicative of the quantities of aDparently identical or s~milar pro~3ucts. THE KROGER CO REPORT NO. 36454 PROJECT NO. 0903506037 PAGE 2 DATE OF SERVICE: 1/22/96 REPORT OF TESTS (Continued) FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NO LOCATION I%1 (%) (PM IPcfl (% mm) 5. 30 South & 65~ west of the northeast corner second lift 14 6 13 5 110 1 116.5 95 6. 30 South & 65' west of the northeast corner first lift 13 9 13 5 110 7 116.5 95 7. 60 South & 65' west of the northeast corner second lift 13 2 13 5 112 4 116.5 96 8. 60 South & 65~ west of the northeast corner first lift 14 0 13 5 110 1 116.5 95 9. 30 South & 120' west of the northeast corner second lift 14 2 13 5 110 6 116.5 95 10. 30 South & 120' west of the northeast corner first lift 15 5 13 5 110 1 116.5 95 I~. 60 South & 120' west of the northeast corner second lift 14 0 13 5 110 5 116.5 95 ~2. 60 South & 120' west of the northeast corner first lift 13 8 13 5 110 2 116.5 95 An asterisk (*) appears next to test results which do NOT meet the project specifications as noted on page 1. Technician: Paul D. Butler Started: 08:00A~M Stopped: 10:O0~M C.E.T. Report Distribution: MAXIM TECH..SOUTHWESTERN LABS (1) THE KROGER CO (1) David Christopher, inc. ~ E~ (1) City of Coppe[[ III, CET 1007 LW Cur letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced except in ,~11 'without the acproval cf the testing laboratory. The use of ourname must receive our written approval. Our letters and rec)orts &D=ly Only to the sample tested and/or inspecte~l, and are not indicative of the cluantit~es of apparently identical or s~milar ,3rcduc:s.