Loading...
WA9302-LR 951205 (6)WG']EOTECHNICALE I GEE Consultants, inc. E [NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: December 5, 1995 Date Concrete Placed: October 26, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank concrete Report No.: 38 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Piers MATERIALS s ..... , ~ '~'~' INSPECTION DATA Description (lbs ./Cu. Yd.) Mix Number: 686 Time Sample Batched: 9:20 am Cement: Time Sampled: 10:20 am Fly Ash: Sample Location: Pier No. K-7 Truck/Ticket No: 195/13404 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 68°F Fine Aggregate: Concrete Range: 67°F Admixtures: Slump Range (inches): 5V2 Weather Conditions: Sunny 1 Time Started: 2 Time Completed: Added Water: 5 gal. Sample Air Content (%): No .Test Total Cubic Yards Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Lead Compressive Strength Remarks Number Slumt~ (in.) (Days) Te~ted (Lbs.) (Lbs./Sq.in.) CWT 153 51/2" 7 11/02/95 120,440 4,260 CWT 154 5 lA ,, 7 11/02/95 126,220 4,460 CWT 155 5~h" 28 11/23/95 152,380 5,390 CWT 156 5~h" 28 11/23/95 153,840 5,440 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: P. Chen Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finldea Mr. Gary Herron - RediMix Concrete OB~ Consultante, Inc. Reviewed by: ~~L'