Loading...
Lakeside V2-LR 960115 Maxim Tech.. Southwestern Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF IN-PLACE DENSITY CEENT: TH~. Y~OC~ CO Attn: Michael Roaas 100 Kroger Drive Keller, TX 76248 PROJECT NO.: 0903506037 REPORT NO.: 35695 PROJECT: Kroger DATE OF SERVICE: 1/04/96 AUTHORIZATION: REPORT DATE: 1/15/96 SERVICES: Perform in-place density and moisture content tests to determine the degree of field compaction. PROJECT DATA MOISTURE/DENSITY RELATIONS CONTRACTOR: David Christopher, Thc. OPTIMUM MAXIMUM MATERIALS MOISTURE % DENSrTY ocf TEST OF: Building Pad 35458A- Tan Sand 12.0 110.5 Building Pad 35461-Lt. brown clayey sand* 12.0 121.5 Building Pad 35460A-Tannish brown clayey ** 8.5 130.0 METHOD OF TEST: DENSITY: ASTM D2922 SPECIFICATION MOISTURE: ASTM D3017 DENSITY: 95% DRY DENSITY MOISTURE: __. 2% opt moist REPORT OF TESTS FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NO LOCATION 1. 65' West and centerltne of building, first lift 12.0 12.0 111.4 110.5 101 2. 90' West and centerltne of building, 2nd lift 11.0 12.0 119.8 121.5 99 3. 160' West and centerline of building, 1st lift 14.0 12.0 111.1 110.5 101 4. 165' West and centerline of building, 2nd lift 13.9 12.0 115.6 121.5 95 Report Of Tests Continued On Page 2 1007 LW ~ lett~ers..a~d reports .are. f..or ~e .excl.us. lve u. se of_the client .to whom they are ad. dressed .m~.~d shall not be reproduced except In nj, .wm~.m rap. apl=roves m me ~esang moormory, i ne use oz oumame must rece,ve our wmzen approval. Oui' lettem and re.ports apply omy to me sample tested and/or Inspecte~J. and are not InOicatJve of the quantities of al~pared*Jy IdenflcaJ or similar pro~Jucts. THE KROGE~ CO REPORT NO. 35695 PROJECT NO. 0903506037 PAGE 2 D;.TE OF SERVICE: 1/04/96 REPORT OF TESTS FIELD OPTIMUM FIELD MAXIMUM TEST MOISTURE MOISTURE DENSITY DENSITY DENSITY NO LOCA~ON {%) (%) (P~ (P~ ~ m~ 5. 65' East and centerline of building, 2nd lift 11.3 12.0 116.2 121.5 96 6. 30' East and centerltne of building, 1st lift 10.5 12.0 121.8 121.5 100 7. 65' East and 35' north of southwest corner building, 2nd lift 10.9 12.0 117.7 121.5 97 8. 100' West and 35' north of southeast corner building, 2nd lift 12.5 12.0 116.2 121.5 96 9. 40' West and 20' north of southeast corner building, 2nd lift 8.8 8.5 127.7 130.0 98 Test results on this report meet project specifications as noted on page 1. ADDITIONAL COMMENTS: * 35461- w/gravel ** 35460A - sand w/gravel Technician: Paul D. Butler Started: 09:30AM Stopped: ll:30A~ C.E.T. Report Distribution: MAXIM TECH.~OUTHWESTERN LABS (1) THE I(RO6ER CO (1) David Chr~steld~er, Inc. (1) City of CoppeL[ Arthur Etherly III, CE1' 1007 LW .Oqr_ letters and reports are for the.exclusive use of_the client .to whom they are addressed .ap..d shad not be reproduced except n /ull .w~ .out_t~e_approv~. of. ~ .tesa.n.g I~ooratqry. ;ne use m .ou,.ma.rp.e must receive, our .win'ten approveJ. Our lettem and reports ap~y omy To me sample res~ea ana/or Inepectei:l. and are not ma4caave of the quammes or apparermy Identical or similar products.