Loading...
Lakeside V2-LR 960108 (2) Maxim Tech.· Southwestern Labs ...... 2575 Lone Star Dr. · P.O. Box 224227 Da,as, Texas 75222 T E Cl4 N O LO(~ I E $ I NC Telephone: (214) 631.2700 FAX: (214) 920-1891 REPORT OF MOISTURE-DENSITY RELATIONS CLIENT: THF Y,_P, OGF-R CO Attn: Michael Roaas 100 Kroger Drive Keller, TX 76248 PROJECT NO.: 0903506037 REPORT NO.: 35460A PROJECT: Kroger DATE OF SERVICE: 12/26/95 AUTHORIZATION: Michael Rokas REPORT DATE: 1/08/96 SERVICES: Obtain sample of material used for construction, prepare sa~mples and perform moisture-density relations test to establish the maximum density and optimum moisture of the material. PROJECT DATA CONTRACTOR: David Christopher, Inc. DATE SAMPLED: 12/26/95 TEST FOR: Subgrade material SAMPLED BY: Francisco Calvillo MATER~AL: See additional comments SAMPLE LOCATION: Sampled from the building pad. METHOD OF TEST: ASTM D698, Method C ASTM D4318, Proc. A REPORT OF TESTS 133 ~ ~ : ZERO AIR VOIDS C~JRVE ~..~, : SPEC=FIC GRAVI:~YJ2.65E MAXIMUM DENSITY, PCF: 130.0 I i .... :..~....:..! ! .. : .... i i OPTIMUM MOISTURE (%): 8.5 Dry PLASTICITY INDEX: NP Dens. ................................... E = Estimated Value 5 7 9 11 13 15 17 MOISTURE CONTENT (%) Comments: Soil description: Tannish brown clayey sand with gravel Technician: Jay Canafax, CET Report Distribution: MAXIM TECH.eSOUTHWESTERN LABS (1) THE KROGER CO (1) David Christopher, Inc. ~ ~ (1) City of Coppe[[ , CET 1006 MDR Our I .e[t..ers and reports .are for the exclusive use ofthe client to whom they are addressed and sba not be reproduced except In full .wffnout the approval of the testln~ laboratory, ine use of ourname must receve our wt. itten approval. Ou.r letters and reports apply only to the sample tested and/St inspecteU, and are not indicative of the quantities OT apparently identlcm of similar pro,lucre.