Loading...
WA9302-LR 951128 (4)I"~EOTECHNICAL . E GEE Consultants, Inc. E I NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (2]4) 620-979] · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 28, 1995 Date Concrete Placed: November 7, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 44 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Piers MATERIALS ~o~r~, ~t~h ~. INSPECTION DATA Description (Lbs ./Cu. Yd) Mix Number: Time Sample Bateheal: 9:30 am Cement: TLme Sampled: 9:55 am Fly Ash: Sample Location: Pier No. B.8-4.5 Truck/Ticket No: 192/14125 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 60°F Fine Aggregate: Concrete Range: 65°F Admixtures: Slump Range (inches): 4" Weather Conditions: Cloudy 1 Time Started: 2 Time Completed: Added Water: 45 gal. water on the job Sample Air Content (%): No Test Total Cubic Yards Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressire Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq. In.) CWT 177 4" 7 11/14/95 113,100 4,000 CWT 178 4" 7 11/14/95 115,460 4,080 CWT 179 4" 28 12/06/95 CWT 180 4" 28 12/06/95 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: P. Chen Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shin~ek, Jacobs and Fim~dea ~ER Consultante, Inc. Reviewed by: ~~