Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Magnolia Park-LR 981105
FU(~RO SOUTH, INC. CLIENT: PROJECT: COMPRESSIVE STRENGTH OF CONCRETE Eastern Deveiopmant Report Magnolia Park, Coppeil, Texas PI i. ~PLE DA~: Octo~26, 19~ ;gO ~0 vtq~o Lane; Oa#~, Texas 75229 )72) 484-8301; Fax (972) 620-7328 REPORT rat~: November 5, 1998 oJect No.: 0771-2112 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 78 CONCRETE TEMP. (°F) (As*r~ c.t0e4): 81 TIME BATCHED: 3:00 TIME 8~,MPLED: 3:20 WEATHER CONDITION: Site Concrete CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (xs*ru c.~t): WATER ADDED (gal): On Site 5.3 0 Partly cloudy SLUMP (in.) (Aswa c.t43): 5 ) Waverty LOCATION OF PLACEMENT: Paving: Hand pour at approach from levee t~ ~ cONCRETE C~I~ER COMPRESS~i STREN~H i~ESTS · TOTAL COMPRE~IVE i;~EQUIRED COMPRESSIVE AGE DATE LOAD STRENGTH ~ STRENGTH CYUNDERNuMBER (da)m) TESTED (pound~) (p~l) ~ (p~l) MPC 157 ? 11/02/98 83000 2935 ~ 3000/28 days MPC 158 28 11/23/98 MPC ~so 28 1~8 ~,r , , MPC 160 ' " Fracture (A) unle. otheneise noted Spectflcalion.: Making & ASTM C-31 Testing ASTM C-143, Types of ~ r~ r~l r-i ,, C~dW: Uo~od=: ~ C~0 F=~: ^ ~-~ B ~ C ~ D LJ REMARKS: Technician: Bob Shea SMH/rm Distribution: FUGRO SOUTH, INC. Checked By: ~'~r/ Eastem Development - Preston Skaggs City of Coppell - Larry Davis '-~ Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: Eastern Development PROJECT: Magnolia Park, Coppell, Texas Report n Pr CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH :~ STI~E..!~. TI"I NUMBER (d~) TESTED (pounds) (p~i) / ' (pm) , MPC 153 ? 11/02/98 99000 3501 ~ 3600/28 days MPC 154 28 11/23/98 , ~ MPC 155 28 11/23/98 MPC 156 ~urlng: "'~"'-"'-":-' '-- ' / ' REPORT rote: November 5, 1998 ~Ject No.: 0771-2112 SMH/rm Distribution: Site Concrete 77 80 1:20 pm 1:30 pm CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTU C.;3t): WATER ADDED (gal): Partly cloudy SLUMP (in.) (ASTra C-t43) Paving: Alleyway C, station 1+50 On Site 5.8 0 1.50 Technician: Bob Shea REMARKS: FUGRO SOUTH, INC. Checked By: Eastern Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco "1 ) Virgo La-~; Da#~, Tex~ 75229 72) 484-8301; Fax (972) 620-7328 FUGRO SOUTH, INC. 288 F'h (; Wrgo Lane; 484-8301; Dalt~, Texas 75229 Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE EPORT CLIENT: Eastern Development Report Dpte: November 5, 1998 PROJECT: Magnolia Park, COP~i, Texas PrpJ®ct No.: 0771-2112 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 75 CONCRETE TEMP. (°F) (ASTM C-t0e4): 72 TIME BATCHED: 8:45 TIME SAMPLED: 9:00 WEATHER CONDITION: Partly cloudy LOCATION OF PLACEMENT: Paving; Site Concrete CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) v~'r~ c-23'1): WATER ADDED (gal): SLUMP (in.) (AS13a C.~43) Alleyway A, station 8+00 On Site 6 0 2 SMH/rm Distribution: FUGRO SOUTH, INC. Checked By: ~ - Eastern Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco Tec, tlniclan: Bob Shea REMARKS: TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH ~ STRENGTH .u..-=e-=; (d~y.) TESTE, D (pound.) (P~) ' MPC 149 7 11/02/98 106000 . 3749. / 3600/28 days MPC 150 28 11/23/98 MPC 151 28 11/23/98 , ' MPC 152 Hold ~ / , . ' Fracture ~T.7~e lis (A) ur~ ~;~%~e no~,d Specifications: Making & ASTM C-31 Testing ASTM C-143. Types of I~1 ITl r-~ r-1 c,,dng: Ma~',od,~ ~S~ C-30 F,-~:b~,: ^ ~ B ~ C ~ D U