Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Magnolia Park-LR 981028
FUGRO SOUTH, INC. CUENT: PROJECT: 28~ Ph, COMPRESSIVE STRENGTH OF CONCRETE Eastern Development Report Magnolia Park, Coppell, Texas PI SAMPLE DATE: 20, 1998 CONTRACTOR: Site TICKET NO.: AMBIENT TEMP. (°F): 68 CONCRETE TEMP. (oF) (ASTM C-10S4): 67 TIME BATCHED: 10:00 TIME SAMPLED: 10:20 WEATHER CONDITION: Raining LOCATION OF PLACEMENT: Paving: 0 virgo Lane; ~72) 484-8301: Dallas, Texas 75229 Fax (972) 820-7328 SMH/rm Distribution: Technician: TOTAL COMPRESSIVE RI~QUIRED COMPRESSIVE CYMNDER AGE DATE LOAD STRENGTH ! STRENGTH NUMBER (day~) TESTED (pound~) (Frei) [ (pM) MPc 49 7 10/27/98 Cylinder destroyed in the field/t 3600/28 days . MPC 50 28 11./17/98 Cylinder destroyed in the field MPC 51 28 1 ~/17/98 Cylinder destroyed in the field MPC 52 Hold Cylinder destroyed in the field ' Fracture mode i~ (A)unless othemdse Specifications: Making & ASTM C-31 Testing ASTM C-143, Types of ~ I r~ Curing: Melhods: ASTM C-39 Fracture: A vd[ B VXI C VI D I I REMARKS: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (AS*~ C-~1): WATER ADDED (gal): SLUMP (in.) (ASTU C-14~): Intersection of Canerc~3unt and Mea¢ Batch 3.0 0 8.5 Iowton Ddve William Putrnan FUGRO SOUTH, INC. Checked By: c_ ~ Eastern Development - Preston Skaggs City of Coppell - Larry Davis / Metro-Plex Excavating - Paul Bosco REPORT )ate: October 28, 1998 :}jeer No.: 0771-2112 FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: Eastern Development PROJECT: Magnolia Park, Coppell, Texas 288 Ph (~ Report P, SAMPLE DATE: O Ober 16, 1998 CONTRACTOR: Site TICKET NO.: AMBIENT TEMP. (°F): 82 CONCRETE TEMP. (°F) (ASTM C-10~4): 75 TIME BATCHED: 5:45 TIME SAMPLED: 5:50 WEATHER CONDITION: LOCATION OF PLACEMENT: ?V ir go Lane; Dallas, Texas 75229 72) 484-8301; Fax (972) 620-7328 EPORT )ate: October 28, 1998 )j®ct No.: 0771-2112 CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASm C-23t): WATER ADDED (gal): SLUMP (In.) (ASTM C-t43) Paving: Wavedy Street, station 5+50 Site Site Concrete 4.5 0 3 CONCRETE c~NDERCO.M.:PRESSIVE: S~ENGTH T~$TS:. :: Stand~:~ x t2!i; 2827 :lquare inches : , TOTAL COMPRESSIVE RI~QUIRED COMPRESSIVE AGE DATE LOAD STRENGTH / STRENGTH cYu,o;;,u~; (d=y.) T;ST;= (pound.) (p~) . ~ (p~) MPC 101 7 10/23/98 110000 3891 ~ 3000/28 days / MPC 102 28 11/13/98 ~ , / MPC 103 28 11/13/98 / MPC 104 Hold , | , , Fracture .xxle b (A) unless othem~e Spectflcatiorm: Making & ASTM C-31 Testing ASTM C-143, Types ~ I~I I ITl ITl r-I Cudng: MeltxxJs: ASTM C-39 Fracture: A v~I B V~J C VI D I I REMARKS: Technician: Jay Dykstra SMH/rm Distribution: FUGRO SOUTH, INC. Checked Eastem Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastem Development Magnolia Park, Coppell, Texas Report P; SAMPLE ,DATE; 16,, 1998 CONTRACTOR: Site TICKET NO.: AMBIENT TEMP. (°F): 82 CONCRETE TEMP. (°F) (ASTM C-10S4): 75 TIME BATCHED: 5:00 pm TIME SAMPLED: 5:07 pm WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: 28~ ~ virgo Lane; Dallas, Texa~ 75229 Ph )72) 484-8301; Fax (972) 620-7328 CONCRETE CYMNDER cO.MP~SsIYE ~RENGTH ~S : " TOTAL COMPRESSIVE REQUIRED COMPRESSIVE AGE DATE LOAD STRENGTH ! STRENGTH CYUNDERNuMBER (da~) TESTED (pound~) (p~i) / (pM) MPC 97 7 10/23/98 112000 3961 I' 3000/28 days / MPC 98 28 11113/98 ~ / MPC 99 28. 11113/98 ~ / MPC Fracture mode ~ (A) unlea~ othemdse noted spe~tk~: ~g& ^STM C-31 Te~ng ASTM C-.3, Typ. of I~11 ITl 171 r-I , Curing: , Methods: ASTM C-39 Fracture: ^ 14511 B ~ C E_I O I..J SMH/rm Distribution: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (AS~ C-23~): WATER ADDED (gal): SLUMP (in.) (ASTM C443) Paving: Wavedy Street, station 7+50 Site Site Concrete 4.8 0 3 1/4 Technician: Jay Dykstra REMARKS: FUGRO SOUTH, INC. Checked By: ~ / Eastem Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco Ilia REPORT )ate: Oc~ber 28, 1998 :)ject NO.: 0771-2112 FUGRO SOUTH, INC. 28~ 0 Virgo Lane; ~72) 484-8301; COMPRESSIVE STRENGTH OF CONCRETE CLIENT: Eastern Development R~3ort PROJECT: Magnolia Park, Coppe,, Texas P~ Dallas, Tax~s 75229 Fax (972) 620-?328 CONTRACTOR: Site TICKET NO.: AMBIENT TEMP. (°F): 85 CONCRETE TEMP. (°F) (As~ C.tOe4): 75 TIME BATCHED: 4:00 pm TIME SAMPLED: 4:07 pm WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: Paving: REPORT )ate: October 28, 1998 =ject No.: 0771-2112 CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-~t): WATER ADDED (gal): SLUMP (in.) (.~STM C.143) Waverly Street, station 9+50 Site Site Concrete 5 0 33/4 CONCRETE cyLINOEI~.~ coMPRESSNE STRENGTH T~ES TOTAL COMPRESSIVE R~$1RED COMPRESSIVE AGE DATE LOAD STRENGTH ! STRENGTH CYlINDERNuMBER (day.) TESTED , (pound~) (1~1} ~ MPC93 7 10/23/98 , 86000 3042 ~ 3000/28days MPC, ,94 28 11/~3/98 , MPC 95 28 11/13/98 MPC Hold / Fracture mode ~ (A) Sl:~ciflcatlons: Making & ASTM C-31 Testing ASTM C-143. Types of ~1 I ~ ~ ['"] REMARKS: FUGRO SOUTH, INC. Checked By: ~,; Technician: Jay Dykstra SMH/rm Distribution: Eastern Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: Eastern Development PROJECT: Magnolia Park, Coppell, Texas Report Pr, SAMPLE DATE: 0~r.16, i1998 CONTRACTOR: Site TICKET NO.: AMBIENT TEMP. (°F): 85 CONCRETE TEMP. (°F) (ASTM C.t084): 78 TiME BATCHED: 3:00 pm TIME SAMPLED: 3:02 pm WEATHER CONDITION: LOCATION OF PLACEMENT: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (AST~ C-23t): WATER ADDED (gal): CloudY SLUMP (In.) (AS'm c.~43) Paving: Waverly Street, station 12+50 SMH/rm Distribution: Technician: Jay Dykstm REMARKS: FUGRO SOUTH, INC. Checked By: ~ _i/ Eastern Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco : CONCRETE CYMNDER CO.MPRE~IVE'~RENGTH T~STS ' ': standard ~ x'12: !; 28,27 lquare inche, TOTAL COMPRESSIVE I~EQUIRED COMPRESSIVE AGE DATE LOAD STRENGTH ! STRENGTH CYLINDERNL~__._~R , (day~) TESTED (pound~) (p~i) i~ (p~i) , MPC 89 7 10/23/98 92000 3254. ~ 3000/28 days ~Pc ~0 28 11/1~8 ~PC 91 28 1~/13/08 MPC 92 ' Fracture (Al unless otherwise sp~,=,o~: ~.k~no & ~ c-3~ T.,n0 ~ C-~. Ty;~o~ mi ITl I-/I I-I c~,no: M.U~x~: ^STM C-~9 Fr~ur.: A mI a ~ c V_J D U ~EPORT rate: October 28, 1998 )je~4: No.: 0771-2112 Site Site Concrete 4.7 0 3 288 ) Virgo Lane; Dallas, Texas 75229 Ph (~ 72) 484-8301; Fax (972) 620-7328 FUGRO SOUTH, INC. 2m COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development Magnolia Park, Coppell, Texas SAMPLE DAVE: Report October. !i6,1998, Site CONTRACTOR: TICKET NO.: AMBIENT TEMP. (*F): 85 CONCRETE TEMP. (°F) (ASTU C.1064): 76 TIME BATCHED: 1:45 pm TIME SAMPLED: 1:50 pm WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: Paving: CONCRETE SUPPLIER: pLANT/TRUCK: MIX ID NUMBER: AIR (%) (AST~ C-23,): WATER ADDED (gal): SLUMP (in.) (ASl'~ Banners Cottage Street, station 2+( )72) 484-8301; Fax (9'/2) 620-7328 REPORT )ate: October 28, 1998 3je~3t No,-' 0771-2112 site Site Concrete 5.1 0 3 1/4 TOT ! COM..Essn= OU,. D CO.P SS - -- DATE LOAD $T~"~ / S~N~ CYUNDER A~ i NUMBER (d~) ~D (~n~) (~) ~ (~i) MPC 85 7 10~3198 8~ 3112 ~ 3~8 days M~ 28 11/1~. ~ S~~ Ma~& ASTM ~31 T.fln; ~ ~143. T~--- "'~ ~-- ~-- : ~: ~: AS~,~ Fromm: A ~ B ~ C ~ REMARKS: Technician: Jay Dykstra FUGRO SOUTH, INC. Checked SMH/rm Distribution: Eastern Development- Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. 26~ 0 VIrgo Lane; Ph, 172) 484-8301; Dall~, Texa~ 75229 Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE CLIENT: Eastern Development PROJECT: Magnolia Park, Coppell, Texas Report Pi S~PLE DATE: October. 16,. 1998 . CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 83 CONCRETE TEMP. (°F) (AS'r~ C-t0e4): 75 TIME BATCHED: 11:00 am TIME SAMPLED: 1105 am W~.ATHER CONDITION: Cloudy LOCATION OF PLACEMENT: Site Concrete CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (~'m c-~*~): WATER ADDED (gal): SLUMP (In.) V~TB C.t43) Paving: Madison, station 14+00 REPORT ~ate: October 28, 1998 )jeer No,: 0771-2112 ' '1 Site Site Concrete 4.7 0 31/2 CONCRETE C~:NDER COMPRESSIVE ~RENGTH.:~.STS: : ' TOTAL COMPREUlVE I~EQUIRED COMPRESSIVE CYUNDER AGE DATE LOAD ! STRENGTH ] STRENGTH NUM_~-~_R (days) TESTED (pounds) (psi) ~ (l~i) MPC 81 ? 10/23/98 9'1000 3218 i 300O/28 days MPC 82 28 11/13/98 t ' MPC 83 28 11/13/98 ~ , MPC 84 Hold , ' Fracture modells (A) un:~,~ oU~-.~=~ Curing: Methods: ASTM C-39 Prac~Jra: A i~ B i~l C I(,_1 D L-.J REMARKS: Technician: SMH/rm Distribution: Grag Forsythe FUGRO SOUTH, INC. Checked By: ~ ,/ Eastern Development- Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. 288 Ph 3 Vlrgo Lane; Dallas, Texas 75229 72) 484-8301; Fax (972) 820-7328 COMPRESSIVE STRENGTH OF CONCRETE CLIENT: Eastern Development PROJECT: Magnolia Park, Coppell, Texas Report P: SAMPLE DA~: ~o,~ 16,1 !998 CONTRACTOR: Site TICKET NO.: AMBIENT TEMP. (°F): 83 CONCRETE TEMP. (°F) (AST~ C-1064): 79 TIME BATCHED: 10:30 TIME SAMPLED: 10:40 WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPUER: -PLANT/TRUCK: MIX ID NUMBER: AIR (%) (~m c.23~): WATER ADDED (gal): SLUMP (in.) (ASTM C.143) Paving: Madison Street, station 11 +31.42 ~EPORT late: October 28, 1998 )je, ot No.: 0771-2112 S~e Site Concrete 4.3 0 3 SMH/rm Distribution: FUGRO SOUTH, INC. Checked By: ~-/ Eastem Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco Technician: Jay Dykstra REMARKS: : CONCRETE C~INDER COMPRESSWE S~EN~H ~sTS" ~ TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH NUMBER (day~) TESTED (peund~) (p~l) MPC 77 7 10/23/98 92000 3254 | 3000/28 days MPC 78 28 11/1 8 / MPC 79 28 11/13/98 ~ , , MPC 80 Hold Fracture mode tb (A) unless othem4se noted Spedflcatkms: Making & ASTM C-31 Testing ASTM C-143, Types of I~1 I'~ r-~ r-'l Cuing: Me~xxls: ASTM C-39 , Fracture: A w FUGRO SOUTH, INC. 28~ COMPRESSIVE STRENGTH OF CONCRETE CLIENT: Eastern Development PROJECT: Magnolia Park, Coppell, Texas Report PI SAMPLE DATE: October 16, 1998 CONTRACTOR: Site TICKET NO.: AMBIENT TEMP. (°F): 80 CONCRETE TEMP. (°F) (ASTM C-1064): 76 TIME BATCHED: 8:25 am TIME SAMPLED: 8:30 am WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: Paving: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASH C-~): WATER ADDED (gal): SLUMP (in.) (ASTM C-~43) Madison Street, station 6+00 Virgo Lane; Daila$, Texas 75,229 '2) 484-8301; Fax (972) 620-7328 REPORT )ate: October 28, 1998 3Jeer No.: 0771-2112 Site Site Concrete 4.8 0 3 114 ' CONCRETE iCYLINDER CO~pRESSNE~RENGTH .~STS I TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH !! STRENGTH NUM~;R (days) TESTED (pound~) ,(pal) ~ , (pal) MPC 73 7 10/23/98 99000 3501 F 3000/28 days MPC 75 28 11113/98 MPC 76 Hold Curing: Idelhod~: ASTM C-39 : I~ B Y..51 , REMARKS: Technician: Jay Oykstra SMH/rm Distribution: FUGRO SOUTH, INC. Checked By: c-'-- ... jr Eastem Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CUENT: PROJECT: Eastern Development Report Magnolia Park, Coppell, Texas PI O ober 1998: SAMP" DATE: CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) ¢,ks'r~ c.'~o,4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Site Concrete 87 83 3:25 3:30 CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR ('/.) (.STa C-~'~): WATER ADDED (gal): Clear SLUMP (in.) (AST~ C.143: Paving: Canemount Street, station 3+00 COMPRE~5~-~-'~' I I _ .__ I ~ r~An I STRENGTH MPC 72 ~ld._._~..J..____~ ~ ~ s catJons: Making & ~TM ~1 T~ ~ ~1~, ~ T~ Cud~: ~: A~39' REMARKS: Technician: Jay Dykstra FUGRO SOUTH, INC. Checked By: "'"'- ./ SMHIrm Distribution: Eastam Development- Preston Skaggs City of Coppell - Larry Davis Metro-Plax Excavating - Paul Bosco 0 Virgo Lane; Dallas, Taxa~ 75229 ~72) 484-8301; Fax (972) 62D-7328 REPORT late: October 28, 1998 =Ject No.: 0771-2112 SEe Site Concrete 4.5 0 3 REQUIRED COMPRESSIVE STRENGTH 3000/28 da s_,y.~._~ FUGRO SOUTH, INC. CLIENT: PROJECT: 28~ COMPRESSIVE STRENGTH OF CONCRETE Eastern Development Report Magnolia Park, Coppell, Texas PI SAMPLE DATE: October 15, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 86 CONCRETE TEMP. (oF) (AST~ C.t064): 81 TIME BATCHED: 2:30 TIME SAMPLED: 2:35 WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving: 0 Virgo Lane; Dallas, Texas 75229 172) 484-8301; Fax (972) 620-7328 REPORT )ate: October 28, 1998 =ject No.: 0771-2112 Site Concrete CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTU C.Z31): WATER ADDED (gal): SLUMP (In.) (AST~ C.t4~) Cenemount Street, station 1+50 Site Site Concrete 4.5 31/2 ~ coNcRETE CYLINDER CO ,.M pRESSNE ~RENGTH '~ ESTS TOTAL COMPRESSIVE REQUIRED COMPRESSIVE AGE DATE LOAD STRENGTH / STRENGTH CYUNDER (day~) TESTED (pound.) (p~l) / (rmi) NU..M._~_R MPC 65 7 10/22/g8 gT000 3431 i ~ 3000/28days MPC 56 28 11/12./98 / . 28 11/12/g8 ~ MPC 67 MPG 68 Hold / "- = ted Fracture ,T,C.~II~ (A) cin:~.~ o,,~-~,~ no Guring: Methocl~: ASTM C-39 Fracture: A ~.~ B v~ C v~ D L..J REMARKS: Technician: Jay Dykstra SMH/rm Distribution: FUGRO SOUTH, INC. Checked By: -~'-- ,/ Eastern Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development Report Magnolia Park, Coppell, Texas PI CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 85 CONCRETE TEMP. (°F) (As'm c.to~4): 83 TIME BATCHED: 1:00 pm TIME SAMPLED: 1:07 pm WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving: Site Concrete CONCRETE SUPPUER: PLANTrrRUCK: MIX ID NUMBER: AJR (%) (ASTU C.2~1): WATER ADDED (gal): SLUMP (in.) (AST~ C.143) Canemount Street, station 4+00 ) Vlrgo La-,e; E-~;;~, T-:--_:---~ 72) 484-8301; Fax (972) 620-7'328 EPORT )at~: October 28, 1998 )ject No.: 0771-2112 Site Site Concrete 5.2 0 3 TOTAL COMPRESSIVE I~QUIRED COMPRESSIVE .~. nATE LOAD ! STRENGTH ! STI?__N,?'H CYLINDER (~,.-~'~) TESTED (~"~_J_qd~) (p~l) , ~ , [13m ,, MPC 61 7 10/22/98 96000 3395 ~ 3000/28 days MPC62 28 11/12/98 ,' ~ MPC63 H2:d 11/12/98 ~ REMARKS: Technician: Jay Dykstra SMHIrm Distribution: Checked By: ~ - FUGRO SOUTH, INC. Eastern Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development Magnolia Park, Coppell, Texas 28~ Ph (~ Report P, SAMPLE, DATE: o~o~r 1.5~, 1998 CONTRACTOR: Site TICKET NO.: AMBIENT TEMP. (°F): 85 CONCRETE TEMP. (°F) (ASTU C.t0e4): 82 TIME BATCHED: 11:00 am TIME SAMPLED: 11:05 am WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Paving: 3 Vlrgo Lane; Dall~. Texa~ 75229 72) 484-8301; F~x (972) 620-7328 ~EPORT late: October 28, 1998 )ject No.: 0771-2112 CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-23t): WATER ADDED (gal): SLUMP (in.) (ASTM C-~43) Canemount Street, station 7+00 Site Site Concrete 5.1 0 3 1/4 CONCRETE CYLIND~ COMPliNE STREN~H T~STS TOTAL COMPRESSIVE REQUIRED COMPRESSIVE AGE DATE LOAD STRENGTH ! STRENGTH CYLINDER (dly8) TESTED (PoUnds) i (1~i) , NUMBER ] MPC 57 7 10/22/98 03000 3289 ~ 3000/28 days MPC ss 28 11/~2~8 i Specifications: Making & ASTM C-31 Testing ASTM C-143, Types of Curing: Methods: ASTM C-39 Fracture: A 1(..3l B ~ ,, C vi p I I REMARKS: Technician: Jay Dykstra SMH/rm Distribution: FUGRO SOUTH, INC. Checked By: ~ ./ Eastern Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco