Loading...
WA9302-LR 951128EOTECHNICAL E GEE Consultants, Inc. EI NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 28, 1995 Date Concrete Placed: November 9, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 46 Contractor: Natgun Collstrtlction Project No.: 95-0196 Concrete Supplier and Plato: RediMix Concrete - Plant #1 Location of Placement: Piers MATERIALS ~o~e, ~at~h ~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 686 Time Sample Batched: 10:20 am Cement: Time Sampled: 10:55 am Fly Ash: Sample Location: Pier No. I-2 Truck/Ticket No: 127/14364 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 65°F Fine Aggregate: Concrete Range: 65°F Admixtures: Slump Range (inches): 2.5" Weather Conditions: Sunny 1 Time Started: 2 Time Completed: Added Water: 15 gal. water on site Sample Air Content (%): No Test Total Cubic Yards Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.in.) CWT 185 2.5" 7 11/16/95 144,460 5, 110 CWT 186 2.5" 7 11/16/95 146,140 5,170 CWT 187 2.5" 28 12/07/95 CWT 188 2.5" 28 12/07/95 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: P. Chen Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea GEE Consultants, The. Reviewed