Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Magnolia Park-LR 981014
FUGRO SOUTH, INC. Ph (g LIME STABILIZED SOIL PULVERIZATION RI CLIENT: Eastern Development REPORT DA PROJECT: Magnolia Park, Coppell, Texas PRO, DATE PERFORMED: 0~'8,~, 1~i' Contmctom on Site: Remarks: Pulverization/Gradation tests were performed. Locations and results ar, LIME STABILIZED SOIL PULVERIZATION TEST RES[ Percent Passing Perm Location 1 3/4" Sieve ~ 1 Penton Tap Road southbound, Station 100 223+50 2 Panton Tap Road southbound, Station 100 219+50 Project Requirements: Minimum 100% Mini SPECIFICATIONS: SDHPT Item 260.4 (1972) ~ Sieve SDHPT Item 260.4 (1982) 3/4" Sieve William Putman Fugro South Technician FUGRO SOUTH, INC. Checked By: ,~"~. ' SMH/em Distribution: Eastern Development - Preston Skaggs City of Coppeil - Larry Davis / ) vino I. ane; Da#~, Texa~ 75229 ~2) 4a4-a30~; Fax (972) 620-7328 =PORT TE: October ~4, ~998 ECT NO: 0771-2112 listed below: LTS nt Passing , Sieve 78 77 mum 60%