Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Magnolia Park-LR 980917
FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development Magnolia Park, Coppell, Texas Report D; P~ SAMPLE:DAi:t~: July ~:~, 1998: CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 100 CONCRETE TEMP. (°F) (ASTM C.10~4): 96 TIME BATCHED: 12:30 TIME SAMPLED: 1:25 WEATHER CONDITION: Sunny Site Concrete CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (xs11~ c.23t): WATER ADDED (gal): SLUMP (in.) (ASTU C.t4~ 2~ 10 Virgo Lane; _r~_!!~, Te×=__= 75_~_~e~ Ph. ;)72) 4848301; Fax (972) 620-7328 REPORT re: Septam~r 17, 1998 eject Ne,: 0771-2112 On Site Plant 4 10 4 LOCATION OF PLACEMENT: Paving: Natchas Trace, station 17+75 M :CONC~E CYLINDER CO PRE$SIVE$~I~ENG~H::I TOTAL COMPRESSIVE REQUIRED CCM~SSIVE CYLINDER -GE DATE LOAD STRENGTH ] STR:E. N.?TH NUM.;; (~'~s) TES.~.~, (pounds) ~ (ps~) ~ ~P"~ MPC 41 7 07/29/98 65000 2299 ' / 3000/28days MPC 42 28 08/19/98 77000 2723* MPC 43 28 08/19/98 75000 ; 2652* ~ , , 56 09/16/98 97000 3431 MPC 44 ' Fracture modei. (A) unless otherwise not.d Speciflcatio~$: iV, e.~-~:=. ASTM C-39 Fracture: B Curing: REMARKS: Unit Weight: 149.1 lbs./cu, ft. * Does not meet required compressive strength at 28 days. Technician: Pompey McGee FUGRO SOUTH, INC. Checked By: ~ SMH/rm DiStribution: Eastern DevelOpment - Prasto~p Skaggs City of Coppell ' Larry' Davis~ ......... Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. CUENT: PROJECT: Ph COMPRESSIVE STRENGTH OF CONCRETE Eastern Development Report Da Magnolia Park, Coppell, Texas Pn SAMPLEi DATE: JUlY 1998' CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 101 CONCRETE TEMP. (°F) (ASTM C-1064): 95 TIME BATCHED: 3:00 TIME SAMPLED: 3:15 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: 0 Virgo Lane; Dallas, Texa~ 75229 ~72) 484-8301; Fax (972) 620-7328 EPORT September 17, 1998 Site Concrete CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (,~'m c.2~1): WATER ADDED (gal): SLUMP (in.) (ASTM C-t43) Paving: Natches Trace, station 18+00 )ject No.: 0771-2112 On Site Plant 5 0 41/2 SMH/rm Distribution: Pompey McGee FUGRO SOUTH, INC. Checked By: L"'~~"="mm' .... Eastem Development- Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco Technician: REMARKS: Unit Weight: 150.1 lbs./cu, ft. * Does not meet required compressive strength at 28 days. ~ cONCRETE CYLINDER COMpRESSWE STRENGTHi T~STS· ' L TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH ~ STRENGTH NUMBER (day~) TESTED (pounds) (psi) / (l~i) / MPC 48 56 09/16/98 94000 3325? Fracture mode i~ (A) unie~ othenVM spo~m~t~: M.kt,~ & AS~M C-3~ 'r..,~ ~TM c-iq. T~,. or ~ I IT1 I-/I I"1