Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Magnolia Park-LR 980914
FUGRO SOUTH, INC. 28 COMPRESSIVE STRENGTH OF CONCRETE CLIENT: Eastern Development PROJECT: Magnolia Park, Coppell, Texas Report Da Pf SAM~E DATE:, JUI¥,I?'~ 19981 , CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 85 CONCRETE TEMP. (°F) (AST~ C.10.4): 90 TIME BATCHED: 7:55 TIME SAMPLED: 8:00 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: Site Concrete CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (As'ru c.23.~): WATER ADDED (gal): SLUMP (in.) (AS11~ C443) Machine paving: Alley A-Z, station 10+50 so Virgo Lane; Dallas. Texas 75229 972) 484-8301; Fax (972) 620-7328 REPORT re: September 14, 1998 oject No.: 0771-2112 Batch BatciV0 0 3.0 Checked By: ~ J - DistribUtion: Eastern Development - Prastpn Skaggs · . .......... Metro-P-lex-Excavating - @aul Bos.c.,q ..... . Technician: Chris Cook FUGRO SOUTH, INC. REMARKS: * Does not meet project specifications for required compressive strength. TOTAL COMPRESSIVE REQUIRED COMPRESSIVE AGE DATE LOAD STRENGTH ! STRENGTH CYUNDERNuMBER (days) TESTED (pounds) (p~i) 1, (psi) / MPC 17 7 07/24/98 87000 3077 ! 3600/28 days / MPC 18 28 08/14/98 93000 3289* / MPC 19 28 08/14/98 95000 3360* / MPC 20 56 09111/98 102000 3608 ' Fracture modelis (A) unless ot~erwies noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Types of ~ r'~ ~ r~ , Curing: Methods: ASTM C-39 Fracture: , A I~ B V~I C vi D L_I FUGRO SOUTH, INC. 28 COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development Magnolia Park, Coppell, Texas Report D; Pr SAMPLEDA~: July 17, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 89 CONCRETE TEMP. (°F) (As'tM c-toe4): 92 TIME BATCHED: 10:40 TIME SAMPLE;D: 10:45 WEATHER CONDITION: Sunny Site Concrete CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (AS~M C~3~): WATER ADDED (gal): SLUMP (in.) (ASTM C.143) ~0 virgo Lane; 972) 484-8301; Dallas, Texas 75229 Fax (972) 620-7328 SMH/rm Distribution: Technician: Chds Cook LOCATION OF PLACEMENT: Natches Trace north eyebrow, station 0+50 Batch Batch/0 5.0 0 3,0 REMARKS: CONC. RETEC~INDERiC0. PREssNE STREN~Hi:.? ~S~ TOTAL COMPRESSIVE REQUIRED COMPRESSIVE AGE DATE LOAD STRENGTH / STRENGTH CYLINDER NUMBER. (days) TESTED (pounds) (psi) ! (psi) / MPC 21 7 07/24/98 74000 2617 [ 3600/28 days / MPC 22 28 08/14/98 92000 3254* / MPC 23 28 08/14/98 94000 3325* / MPC 24 56 09/11/98 107000 3744 ' ' Frac~re mode is (A) unless othe~se noted s~=~=.: M.~.o & ^sM c~ T.,n0 ~S~ C-~. T~.~o~ I~11 rtl I-/l I-I Cudng: Methods: ASTM C-39 Fracture: , A I~11 B V~J C VI D I I * Does not meet project specifications for percent moisture content. FUGRO SOUTH, INC. Checked By: ~ Eastem Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco REPORT I:O: September 14, 1998 oject NO.: 0771-2112 FUGRO SOUTH, INC. 28 COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development Magnolia Par~, Coppell, Texas Report D; SAMPLE DA E: JUly 16,..1998: CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 101 CONCRETE TEMP. (°F) (ASTM C.t0e4): 95 TIME BATCHED: 4:25 pm TIME SAMPLED: 4:30 pm WEATHER CONDITION: sunny LOCATION OF PLACEMENT: Paving: Site Concrete CONCRETE SUPPLIER: PLANT/TRUCK: MiX ID NUMBER: AIR (%) (AS'ru C.231): WATER ADDED (gal): ~0 virgo I~-~; Da;;as, Texas 75-?~9 972) 4848301; Fax (972) 620-7328 REPORT September 14, 1998 oject No.: 0771-2112 Batch Batch/0 0 SLUMP (in.) (ASlla c44~)1: 3.5 Alley, machine pour, Alley C, statiott 7+00 EaStern Development - Preston Skaggs City of Coppell - Larry Davis ''~ Metr0-Plex Excavating - Paul Bosco SMH/rm Distribution: Checked By: ~ FUGRO SOUTH, INC. Technician: Chris Cook REMARKS: * Does not meet project specifications for required compressive strength. CONCRETE CYLINDER. :CO.MPRE$$1VE ::SH~ENG~ Standard 6! x 12' ,~ 28~2T:SqUam inches :: TOTAL COMPRESSIVE I~[EQUIRED COMPRESSIVE AGE DATE LOAD STRENGTH ~ STRENGTH CYUNDER (daYS) ' ' TESTED (pounds) (psi). / (psi) NUMBER 7 7:23.98 ' ~ 76000 2688 / 3600/28 days MPC 13 MPC 14 28 8-13-98 91000 3218' / MPC 15 28 8-13-98 93000 3289* 56 9-10-98 98000 3466* MPC 16 F~c,%.'e rc.-:=_-'~ is (A) un~ ~,en~ise not~ Spedflc~tlons: Melt~ods: ~M~ ....... T , Cur'.~,~: FUGRO SOUTH, INC. 2~ COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development Magnolia Park, Coppell, Texas Report SAMPLr: DA-r =: July 20, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (AS'Ila C-10~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Site Concrete 89 94 10:45 10:55 CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASl~ C,-231): WATER ADDED (gel): Sunny SLUMP (In.) (ASl'~ C.t43) Street paving, hand pour, Natches Trace so 1+50 I0 Vl~go L~-,~; C:::_-:, Tex-_-~ 75~'~-~-- ~72) 484-8301; Fax (972) 620-7328 REPORT re: September 14, 1998 oj~'t NO.: 0771-2112 Batch BatciV0 5.3 0 3.0 theast eyebrow, station :cONCRETE:CYMN DER: CO.MPI~F.S$1~: $ ~'FcENGYH: TOTAL COMPRESSIVE REQUi~u~D AGE DATE LOAD STRENGTH ] STRENGTH CYUNOER (days), TESl ~ (pour. d;) (1~i) , j (i~i) NUM_~;_R MPC25 7 07/27/98 85000 3006 i 3600/28 days MPC 26 28 08/17/98 100000 ' 3537:. .... 103000 3643 I MPC 28 56 U~ll4/~J~ Fi-_-.-~ ~=re Speciflcation~: ...... Fracture: A B [~ REMARKS: ' Does not meet project specifications for required compressive strength. Technician: Chris Cook FUGRO SOUTH, INC. Checked By: ~ SMH/rm Distribution: Eastern Development - Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. 28~ COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development Report DI Magnolia Park. Coppell. Texas Pr SAMPLED TE: 1998 Vtrgo Lane: Da#~. Texa~ 75229 4848301: Fax (972) 620-7'328 .EPORT September 14, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-10~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Site Concrete 100 95 1:20 1:30 CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (AST. c-,~*q: WATER ADDED (gal): Sunny SLUMP (in.) (Aalla c-~43) Street paving, hand pour, Natches Trace, sta ~®Ct No.: 0771-2112 Batch Batch/O SMHIrm Distribution: REMARKS: * Does not meet project specifications for required compressive stre~ Ith Technician: Chds Cook FUGRO SOUTH, INC. Checked By: Eastern Development- Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco CONCRETE C~INDER CO PRESS[VE STRENGTH ~ · stan~!i~i" ~1~ :,; 28= SqUarei.lnches, i. ,,, TOTAL COMPRESSIVE REQUIRED COMPRESSIVE AGE DATE LOAD STi~. NGTH ] $ .I'I~..GTH CYUNDER NUM_~_R { d,a'X'~) TESTED (pounds) (poi) MPC 29 7 07/27/98 82000 2900 ] 3600/28 days MPC 30 28 08/17/98 89000 . I; 3148" MPC 31 28 08/17/98 91000 3218' ~ . MPC 32 56 09114/98 105000 3714 ._1,_ " ' Fracture 0 3.0 13+00