Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Magnolia Park-LR 980817
FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE REVISED CLIENT: PROJECT: Eastern Development Magnolia Park, Coppeil, Texas 28 R®po~ Pn SAMPLE DATE::: JUly, 16 , 1998 Site Concrete CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 101 CONCRETE TEMP. (°F) (ASWa C40~4): 95 TIME BATCHED: 4:25 pm TIME SAMPLED: 4:30 pm WEATHER CONDITION: sunny LOCATION OF PLACEMENT: Paving: }0 Virgo Lane; Dallas, Texas 75229 972) 484-8301; Fax (972) 620-7328 Technician: Chds Cook FUGRO SOUTH, INC. , sMH/rm Distribution: ......... Eastern Development-.-Presto~-i§kaggs City of Coppell - Larry, Davis/ Metro-Plex Excavating - Paul REMARKS: Revised to reflect correction on required psi. ! CONCRETE CYLINDER,,COldpRE$SIVE STRENGTH: TESTS. : '. '' '" -' ~" .............. ~ T'O~L ~ COMPRESSIVE RI~QUIRED COMPRESSIVE ~ ' AGE DATE LOAD STRENGTH ~ STRENGTH CYLINDERNuMBER {days) TESTED (pounds) ....... (poi).- : ......... t' ........ (psi) .......... MPC 13 7 7-23-98 76000 2688 ' ~ 3000/28days MPC 14 28 8-13-98 91000 3218 ~ MPC 15 28 8-13-98 93000 3289 ~ MPC 16 Hold Fracture mode i~(A) unle,a~ omefl~ise noted Specifications: Making S ASTM C-31 Testing ASTM C-143, Types of ~;;~ r~ r~ r'~ Curing: Methods: ASTM C-39 Fracture: A IC51L B V~l C vi D I_.1 )at~: August 17, 1998 ,ject No.: 0771.2112 Batch BatctV0 0 3.5 ~+00 CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) {Aswa c.23t): WATER ADDED (gal): SLUMP (in.) (ASWa C-143): Alley, machine pour, Alley C, station EPORT FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CLIENT: PROJECT: Eastern Development Magnolia Park, Coppell, Texas 28 Report Pre SAMPLE: DATE:: July 16, 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 84 CONCRETE TEMP. (°F) (ASTM C.1064): 86 TIME BATCHED: 8:00 TIME SAMPLED: 8:05 WEATHER CONDITION: Sunny Site Concrete CONCRETE SUPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (AS?M Dallas, T®xa~ 75229 Fax (972) 620-7328 SMH/rm Distribution: Technician: Chds Cook LOCATION OF PLACEMENT: Paving, Levee Place, station 0+50 Batch Batch / 0 3.0 REMARKS: CONCRE~ CYLINDER coMpRESSIYE sTRENGTH TiI~STS i i standard 6ii ~x 12!!i28~27aquam inche, TOTAL COMPRESSIVE RI~QUIRED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH ~ STRENGTH NUMBER Idays) TESTED (pounds) (psi) ! I (psi) MPC 1 7 7-23-98 70000 2476 I / 3000/28 days ! MPC 2 28 8-13-98 86000 3042 MPC 3 28 8-13-98 88000 I 3112 MPC 4 Hold Fracture rhode i//(A) unlas~ otherwise noted s,.:~,~o..: ~,k~,, & AS~ C-3~ T~., ~ C-~3. ~'~,, of Ell rtl I-'/I I--I Curing: Methods: ASTM C-39 Fracture: A I~lt B V~l C vi D U Eastern Development- Preston Skaggs City of Coppell - Larry Davis */ Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. II Checked B .~-"'"'~ .~ ¸ma ~EPORT )ate: August 17, 1998 iect No.: 0771-2112 FUGRO SOUTH, INC. CLIENT: PROJECT: COMPRESSIVE STRENGTH OF CONCRETE Eastern Development Report Magnolia Park, Coppell, Texas Pr, SAMPLE DATE:, JulY 1998 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 89 CONCRETE TEMP. (°F) (ASTM C.1064): 92 TIME BATCHED: 10:55 am TIME SAMPLED: 11:00 am WEATHER CONDITION: sunny ~ virgo lane; )72) 484.-8301; rEPORT Site Concrete CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-251): WATER ADDED (gal): SLUMP (in.) (ASTM C.143): Dallas, Texas 75229 Fax (972) 620-7328 SMH/rm Distribution: Technician: LOCATION OF PLACEMENT: Street paving, machine pour, Natches Trace, .tation 7+50 5.1 0 3.0 REMARKS: CYLINDER..Mco PRESSIVES~ENGTH T~STS·~ ' CONCRETE: , : standard 6 !i x12 TOTAL COMPRESSIVE REQUIRED COMPRESSIVE AGE OATE LOAD STRENGTH ~ | STRENGTH CYLINDER NUMBER (days) TESTED (pounds) (psi) ! (psi) MPC 5 7 7-23-98 90000 3183 ! 3000/28 days MPC 6 28 8-13-98 114000 4032 MPC 7 28 8-13-98 111000 3926 / MPC 8 Hold , [ , Fracture mode iq (A) unless otherwise noted Specifications: Making& ASTMC-31 Testing ASTMC-143, Typesof I~| r"~ I"~ I"""] Curing: Methods: ASTM C-39 Fracture: , A Y-.21~B V~I C vi D I I Chds Cook Eastern Development- Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating - Paul Bosco FUGRO SOUTH, INC. Checked By:~ ect No.: 0771-2112 Batch Batch/0 )ate: August 17, 1998 FUGRO SOUTH, INC. CLIENT: PROJECT: 28E 0 viq~o Lane; COMPRESSIVE STRENGTH OF CONCRETE Eastern Development Report Magnolia Park, Coppell, Texas Pti SAMPLE DA~: July 16, 1998~ CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 96 CONCRETE TEMP. (°F) (ASTM C.1064): 93 TIME BATCHED: 12:55 pm TIME SAMPLED: 1:00 pm WEATHER CONDITION: Sunny Site Concrete CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTtl C-~1): WATER ADDED (gal): SLUMP (in.) (ASTM Dallas, Taxa~ 75229 Fax (972) 620-7328 SMH/rm Distribution: Technician: Chris Cook LOCATION OF PLACEMENT: Street paving, machine pour, Natches Trace, ration 11+50 Batch Batchl0 REMARKS: ::CONCRETE CYLINDER,, cOMPRESS~E STRENGT. TE~STS , standa~ $, x 12~; 28i27 square:inch"' TOTAL COMPRESSIVE REQUIRED COMPRESSIVE AGE DATE LOAD STRENGTH i! STRENGTH CYUNDER (~y.) TESTED (~unds) (~i) ; ~ (~i) NUMBER MPC 9 7 7-23-98 75000 2652 ~ 3000/28 days r MPC 10 28 8-13-98 96000 , , 3395 , MPC 11 28 8-13-98 97000 3431 MPC 12 HoW J ,, Fra~re Specifications: Making & ASTM C-31 Testing ASTM C-143, Types of , Curing: Methods: ASTM C-39 Fracture: A V~l J B I/Xi C VI D U FUGRO SOUTH, INC. Checked Eastern Development- Preston Skaggs City of Coppell - Larry Davis Metro-Plex Excavating. Paul Bosco [EPORT )ate: August 17, 1998 eot No.: 0771-2112