Loading...
Magnolia Village-CS010628June 28, 2001 Ted Pittman SCI Denton Tap, Ltd. 11551 Forest Central Drive, Suite 304 Dallas, TX 75243 RE: Magnolia Village Lot 1, Blk A Fee Assessment Letter / REVISED Dear Mr. Pittman: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $19,125.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also, provide a copy of the Engineer's estimate or contract to our office so the 2% and 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be ordered when these fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions please call 972/304-3679. Sincerely, 9 6fa ' P.E. Director of Engineering and Public Works cc: Jennifer Armstrong, Finance Director Greg Jones, Building Official Rhonda Brothers, Engineering Secretary Glenn Hollowell P.E., Asst. Dir. of Public Works Gary Sims, Dir. of Leisure Services Devlp feemagnoliavlglotblka, doc 255 PARKWAY 'It' P.O BOX 478 'k COPPELL TX 75019 ~r TE.L 972/46,2 0022 ~ FAX 972./304 3673 DEVELOPMENT FEE TABLE Project: Magnolia Village Lot 1 Blk A Date: 6/28/2OOl TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,925.00 $11,925.00 (100% due prior to Council Approval) Water Tap Inspection Fee $250.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $378.74 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $4,504.13 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $70.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project II Construction Inspection Fee Information not Available II TOTAL $24,617.87 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $19,125.00 DEVELOPMENT FEE WORKSHEET PROJECT: Magnolia Village Lot 1 Blk A DATE: 6/28/2001 Water Impact Fee: Domestic Meter(s): 2 - 2 inch = 16 ESU's Irrigation Meter(s): 1 - 2 inch = 8 ESU's 0 = 0 ESU's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total#: 26.5 ESU's @ $450.00 ea. $11,925.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 5 Connections @ $50.00 ea. $250.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $189.37 $378.74 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $189.37 $189.37 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 2 Fireline Meter(s) @ $2,157.38 $4,314.76 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 @ $450.00 ea. $7,200.00 Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. $100.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ali developments): Total #: 2 Lots @ $50.00 ea. $100.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: 0 Single-family @ $0.00 per lot $0.00 0 Multi-family @ $0.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Magnolia Village Lot 1 Blk A DATE: 6/28/2001 ROADWAY IMPACT FEE: Service Area * 1 Category ** Commercial Land Use ** Shopping Center Building Area (sO 15,600 Development Units ** 15.60 Vehicle Miles per Development Unit ** 4.77 Fee per Vehicle Mile *** $300 Roadway Impa~t Fee du~ = (DeveloPment Units) x I I(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $22,323.60 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study) Total Credit per Developers Agreement Dated January 31,200 $22,323.60 A~OUNrZ~U£: $0.00 [ Available credit for future development on the original 10 acre site is $1112.40 ($23,436 - $22,323.60 = $1112.40)