Loading...
WA9302-LR 951120[EOTECHNICALE GEE Consultants, inc. EI NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 20, 1995 Date Concrete Placed: October 25, 1995 Standard 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 37 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Piers MATERIALS ~ ....., ~,~h ,~. INSPECTION DATA Description 0bs./Cu.Yd.) Mix Number: Time Sample Batehe& 9:58 am Cement: Time Sampled: 11: 10 am Fly Ash: Sample Location: Pier No. I-7 Truck/Ticket No: 125/13299 Coarse Aggregate: Temperature: Imermediate Aggregate: Ambient Range: 60°F Fine Aggregate: Concrete Range: 62°F Admixtures: Slump Range (inches): 4V2" Weather Conditions: Cloudy 1 Time Started: 2 Time Completed: Added Water: 10 gal. Sample Air Content (%): No Test Total Cubic Yards Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Tolal Lead Compressire Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq. In.) CxNT 149 4%" 7 11/01/95 121,200 4,290 CWT 150 4~h'' 7 11/01/95 121,060 4,280 CWT 151 4~h'' 28 11/22/95 CWT 152 4~A" 28 11/22/95 Test Methods Utilized Fracture Regular Cylinders Made By: P. Chen ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea Mr. Gary Herron - RediMix Concrete ~ coneultente, Inc. Reviewed by: ·