WA9302-LR 951117 (2)I~'EOTECHNICAL
E GEE Consultants, inc.
E
I NVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: November 17, 1995 Date Concrete Placed: October 16, 1995 Standard 6"x12"
Client: City of Coppell Area 28.27 Square Inches
Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 30
Contractor: Natgun Construction Project No.: 95-0196
Concrete Supplier and Plant: RediMix Concrete - Plant #1
Location of Placement: Pier
MATERIALS sours, ~t~w~. INSPECTION DATA
Description (tbs./C.Y)
Mix Number: 686 Time Sample Bateheal: 8:00 am
Cement: Time Sampled: 8:55 am
Fly Ash: Sample Location: Pier No. F-5
Truck/Ticket No: 189/12617
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 60°F
Fine Aggregate: Concrete Range: 62°F
Admixtures: Slump Range (inches): 81/~''
Weather Conditions: Sunny
1 Time Started: 7:00 am
2 Time Completed: 5:30 pm
Added Water: Sample Air Content (%): No Test
Total Cubic Yards Placed: 7.75 C.Y.
Required Strength (Lbs./sq.in.): 4,000
specimen Measured Age Date Total Load Compressive Strength
Remarks
Number Siump (in.) (Days) Tested (Lbs.) (Lbs./Sq. ln.)
CWT 121 81/2" 7 10/23/95 128,900 4,560
CWT 122 8'/2" 7 10/23/95 126,500 4,470
CWT 123 81/2" 28 11/13/95 155,660 5,510
CWT 124 8%" 28 11/13/95 158,900 5,620
Test Methoas Utilized Fracture Regular
ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: P.Chen
Remarks aml/or Distribution:
cc: Mr. Larry Davis - City of Coppell
Mr. Bob Barbarisi, Jr. - Natgun Corporation
Mr. Gary Hendricks - Shimek, Iacobs and Finklea