Magnolia Park-LR 970814FUGRO-McCLELLAND (SOUTHWEST), INC.
Virgo Lane; Dallas, Texas 75229
(972) 484-8301; Fax (972) 620-7328
GENERAL REPORT
CLIENT: Eastern Development
PROJECT: Magnolia Park, Coppell, Texas
REPORT
August 14, 1997
~ECT NO: 0771-2112
Services Performed: Visual Inspection
Weather Conditions: Mostly Sunny
Contractors on Site: Metro - Plex Excavation
Remarks: on this date, a representative of Fugro-McClelland was present on the ~ ~bove mentioned project
to perform the following tests and observations as requested:
Soils:
Visually observed the proof rolling operations on the 2.5 feet over excavation
1. Block E, Lots 34, 35, and 36
2. Alley E-2, station 9+50 to station 17+00.
3. In place densities and Moisture test were performed on the over excavated
locations.
at;
back fill at different
Jose Rivera
Fugro-McClelland Technician
SMH/mv
Distribution:
Eastern Development - Tim Murchinson
City of Coppell - Larry Davis ~
Metro-Plex Excavating - Paul Bosco
FUGRO-McCLELLAND (S )UTHWEST), INC.
Saad M. Hineidi, P.E.
Vice President
FUGRO-McCLELLAND (SOUTHWEST), INC.
CLIENT:
PROJECT:
Number
1
2
3
Description
FIELD DENSITY REPORT
Eastem Development REPOR'
Magnolia Park, Coppell, Texas PR
Material
MOISTURE/DENSITY RELATIONS
Proc
Maximum Dry Density
Medium brown clayey sand
Dark gray and medium brown very silty clay
Tan and yellow shale
;!880 Virgo Lane; Dallas, Texas 75229
(972) 484-8301; Fax (972) 620-7328
r' DATE: August 14, 1997
OJECT NO.: 0771-2112
TEST RESULTS
TEST PROCTOR LOCATION UNIT DRY
NO. NO. WEIGHT
220 I Block A, Lot 7, back fill, 3rd lift 113.7
221 2 Block A, Lot 9, back fill, 3rd lift 105.1
222 1 Block A, Lot 11, back fill, 3rd lift 112.2
223 2 Block A, Lot 13, back fill, 3rd lift 108.6
224 2 Block A, Lot 15, back fill, 3rd lift 106.1
225 2 Block A, Lot 17, back fill, 3rd lift 105.9
226 2 Block A, Lot 19, back fill, 3rd lift 106.9
227 3 Block E, Lot 36, back fill, 1st lift 96.9
228 3 Block E, Lot 34, 2nd lift 97.5
Remarks: All densities meet project specifications unless otherwise noted.
113.3
110.3
98.2
~or Results
(pcf) Optimum Moisture (%)
13.0
16.0
23.0
Jose Rivera
Fugro-McClelland Technician
SMH/mv
Distribution:
Eastern Development - Tim Murchinson
City of Coppell - Larry Davis
Metro-Plex Excavating - Paul Bosco
MOIS1 URE
CONTENT I ~ERCENT
16.5
19,9
16.5
18.7
19.4
20 0
178
26 8
22 4
FUGRO-McCLELLAN
PERCENT OF
MAXIMUM DENSITY
100.3
95.3
99.0
98.5
96.2
96.0
96.9
98.7
99.3
Checked by:
D (SOUTHWEST), INC.
FUGRO-McCLELLAND (SOUTHWEST), INC.
FIELD DENSITY REPORT
CLIENT: Eastern Development REPOF
PROJECT: Magnolia Park, Coppell, Texas P1
MOISTURE/DENSITY RELATIONS
Material Pr(;
Number Description Maximum Dry Dens~
1 Brown sandy clay mixed with tan and gray 108.3
calcareous clay
230
231
232
Remarks:
TEST RESULTS
TEST PROCTOR LOCATION UNIT DRY ~
NO. NO. WEIGHT CON'FEN'
229 I Alley, area A, 35 feet south from 106.6 1
northwest comer, 1st lift
I Alley, area A, 35 feet south from 106.4
northwest comer, 2nd lift
1 Alley, Area A, 50 feet east from northwest 103.8
comer, 1st fill
1 Alley, Area A, 50 feet east from northwest 104.5
comer, 2nd lift
All densities meet project specifications unless otherwise noted.
Scott Rogers
Fugro-McClelland Technician
~880 vlrgo Lane; Dallas, Texas 75229
(972) 484-8301; Fax (972) 620-7328
T DATE: August 14, 1997
~,OJECT NO.: 0771-2112
ctor Results
¥ (l~"f) Optimum Moisture (%)
17.5
FUGRO-McCLELLA~
;TURE PERCENT OF
PERCENT MAXIMUM DENSITY
',6 98.4
?.4 98.2
9.0 95.8
S.2 96.5
~ID (SOUTHWEST), INC.
SMH/mv
Distribution:
Eastern Development - Tim Murchinson
City of Coppell - Larry Davis
Metro-Plex Excavating - Paul Bosco
Checked