Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Magnolia Park-LR 980729
FUGRO SOUTH, INC. COMPRESSIVE STRENGTH OF CONCRETE CUENT: Eastem Development PROJECT: Magnolia Park, Coppell, Texas Repc Pr CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 85 CONCRETE TEMP. (°F) p~rrM C-1~4): gO TIME BATCHED: 7:55 TIME SAMPLED: 8:00 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: Site Concrete CONCRETE 8UPPUER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) ~ c..~1): WATER ADDED (gal): SLUMP (in.) {ASl'U Machine paving: Alley A-Z, st~Jon 10+50 Io vi~go Lane; DMal, Taxa~ 75229 ~72) 484.8301; Fax (972) 620.7328 REPORT ,rt Date: July 29, 1998 DJect No.: 0771-2112 Batch Batch/O 0 3.0 TOTAL COM~ R~QUIRED COMPRESSIVE CYUNDER AGE DATE LOAD ~I'RENQI'H ! STRENGTH . J (p,i) NUMBER (days) TESTED (pounde) (I~i) MPC 17 7 07/24/98 87000 3077 ~ 3600/28da~ MPC 18 28 08/14/98 Mpc 19 28 08/14/98 MPC 20 Hold · :i ' i Fraelu~ ~ i~ (A) unleae ~ noted' REMARKS: Technician: Chris Cook SMH/rm Distribution: FUGRO SOUTH, INC. Checked By: Eastern Development - Preston Skaggs City of Coppell - Lan7 Davis Metro-Plex Excavating - Paul Bosco