McDonald's-LR 870428 SOILS AND FOUNDATION INVESTIGATION
MCDONALD'S RESTAURANT
DENTON TAP ROAD & SANDY LAKE ROAD
C0PPELL, TEXAS
REPORT NO. DE-7029
TO
MCDONALD'S CORPORATION
IRVING, TEXAS
BY
TERRA-MAR, INC.
AUSTIN / DALLAS / FT. WORTH / HOUSTON
APRIL 1987
Consulting Englnee~ · GeOtechnl~l · Environmental * Con~lon Martials Testing
April 28, 1987
Report No. DE-7029
McDonald's Corporation
511 E. Carpenter Frwy., Suite 375
Irving, Texas 75062
ATTN: Mr. John Roper
Real Estate and Construction Coordinator
SOILS AND FOUNDATION INVESTIGATION
MCDONALD'S RESTAURANT
DENTON TAP ROAD & SANDY LAKE ROAD
COPPELL, TEXAS
Gentlemen:
Submitted here is our report on the evaluation of soils and
foundation conditions for the above project site. This report
presents the results of field and laboratory investigations
together with recommendations for the design and construction
of foundations for the proposed structure and pavement
sections for automobile parking and drives. This study was
authorized by Mr. John Roper on April 9, 1987.
INTRODUCTION
It iS planned to construct a McDonald's Restaurant at the
above referenced location. Proposed facilities consist of a
single-level structure, paved parking, and drives.
Objectives of this investigation were to evaluate soil
conditions and develop recommendations for the structure and
elevated road sign foundations including foundation type,
depth, and allowable loading. Related construction includes
pavement for automobile parking and drives to be constructed
at or near existing grades. Pavement sections and subgrade
preparations-including the~ necessity, .if any; for soil
stabilization were to be addressed in our study.
This report briefly describes the general soils and design
conditions followed by engineering analyses and
recommendations for the design and construction of foundations
for the proposed structure and pavement for automobile parking
and drives.
2679 Lombardy, Dallas, Texas 7S220 Phone:Z14-352-8352
FIELD AND LABORATORY INVESTIGATION
Subsurface conditions at the site were evaluated by six soil
test borings. These borings were located 'as.specified by the
client. Approximate locations are shown on the Plan of
Borings, Plate 1. Boring depths varied from 5.0 feet in
parking areas to 20.0 feet beneath the structure. Sample
depths, soil. descriptions and classifications (based on the
Unified Soil Classification System) are shown on the Logs of
Borings, Plates 2 through 7. A key to the descriptive terms
and s~mbols used on the logs is presented on Plate 8.
Soil formations were sampled using a thin-walled Shelby tube
sampler to sample cohesive soils while granular soils were
sampled using the split barrel sampler in conjunction with the
Standard Penetration Test (SPT). The borings were drilled dry
without the aid of drilling fluids to more accurately
determine the depth to groundwater. Water observations made
at the completion of drilling and 24 hours later are indicated
on the boring logs.
Field soil classifications were verified by laboratory tests
to determine liquid limit, plastic limit, percent passing the
No. 200 sieve size and natural moisture content. Results of
these tests are tabulated at the appropriate sample depth on
the boring log.
Shear strength of the cohesive soils was evaluated by hand
penetrometer tests and verified by unconfined compression
tests. The strength test results are tabulated at the
appropriate sample depth on the boring logs. The natural
moisture content and unit dry weight, determined as part of
the unconfined compression test, are also shown on the boring
logs.
GENERAL SOIL AND DESIGN CONDITIONS
Site Conditions
The site for the proposed McDonald's Restaurant is located
near the southwest corner of the Denton Tap Road and Sandy
Lake Road intersection in Coppell, Texas. The site is a
vacant lot approximately 115 feet south of Sandy Lake Road, on
the west side of Denton Tap Road. Short grass and weeds cover
the site with several.small to.medium sized, trees scattered ~
throughout the site. The site is relatively flat, sloping to
the north with two to three feet of relief. During the site
inspection no evidence of seasonal high water was noted.
Soil Stratigraphy
The site is geologically located in the Woodbine Formation as
indicated on the Dallas Sheet of The Geologic Atlas of Texas.
Geologic data shows that surficial soils of the Mabank and
Report No. DE-7029 2
Silawa series overlie the area. Generally, these soils
consist of surficial sandy loam underlain by clay loam. The
clays are moderately plastic and are susceptible to moderate
shrink/swell potential accompanying variations in soil
moisture contents. These soils have a moderate to high
corrosivity to uncoated and unprotected steel and a moderate
corrosivity to concrete. -Soil stratigraphy and engineering
properties determined from the results of this study show
similar characteristics. Soil formations encountered at the
site are shown on the boring logs, Plates 2 through 7. These
data indicate that soil conditions are relatively uniform
across the site and can be grouped into major strata as
follows:
Average
Stratum Depth, Ft. Soil Description
I 0.0 - 3.0 Medium dense to dense reddish
brown, brown, tan and gray silty
and clayey fine sand. (SM - SC)*
Note: Borings B-5 and B-6
encountered sandy clays and mixed
clayey sands and sandy clays.
(sc - CL)*
II 3.0 - 16.0 Stiff to hard brownish gray, tan
and gray sandy clay with occa-
sional iron nodules. (CL)*
III 16.0 - Completion Dense to very dense clayey fine
sand. (SC)*
*Classification according to the Unified Soil Classification
System.
Groundwater level observations made at the completion of
drilling and 24 hours later, indicate that groundwater levels
occur below the caved depths of the borings. It should be
noted that groundwater levels may not remain static and will
fluctuate with variations in seasonal precipitation and
surfic±al runoff.
Design Conditions
The surface soils-of ~Stratum I consist mainly of'low plastic'
silty and clayey sands. These soils have liquid limits
ranging from 23 to 26 and plasticity indices ranging from 12
to 15. Present moisture levels in these soils ranged from
three to six percent above the plastic limit, a condition
indicative of low shrink/swell potential accompanying
variations in soil moisture content.
Report No. DE-7029 3
Strata II soils consist of sandy clays. These clays are
compact with shear strengths ranging from 0.31 tons per square
foot (tsf) to 2.63 (tsf). These soils are moderately plastic
with liquid limits ranging from 32 to .35 and plasticity
indices ranging from 21' to 23. Present moisture levels in
these soils ranged from five to seven percent above the
plastic limit, a condition indicative of moderate shrink/swell
potential accompanying variations in soil moisture contents.
The sand formation of Stratum III is relatively strong and
will not be subject to shrink/swell movements accompanying
variations in soil moisture contents.
ANALYSES AND RECOMMENDATIONS
General
Based on the results of the field and laboratory investigation
and the presence of surficial iow plastic clayey sands
underlain by moderately plastic sandy clays that will not be
subject to high shrink/swell movements, it is recommended that
the structure be founded either on a stiffened and
strengthened concrete slab-on-grade or structural loads be
founded on individual shallow spread footings or a continuous
wall footing with an interior floor slab at grade. Both the
slab-on-grade and the shallow footing foundation systems are
adequate and are discussed in the following sections.
Shallow Footings
Shallow footings may be used for the support of structural
loads. They may consist either of spread or continuous strip
footings and may be founded in the medium dense surficial
clayey fine sands or on the stiff to hard sandy clays at a
minimum depth of 3.0 feet below finished grade. The footings
may be proportioned for an allowable bearing pressure of 2,000
pounds per square foot (psi). Minimum recommended spread
footing dimension is 30 inches while the minimum strip footing
width is 18 inches. Foundation settlement for the recommended
loads will be less than 0.75 inch.
Monolithic Stiffened and Strengthened Concrete Slab-on-Grade
As noted earlier, the foundation soils are moderately plastic
and will not be subject to appreciable shrink and swell
movement accompanying changes in moisture content. Therefore,
support of the structure may be on a conventional stiffened
and strengthened concrete slab-on-grade. The grade beams of
the slab may bear directly on the prepared subgrade soils at a
minimum depth of 24 inches. The minimum recommended exterior
grade beam width is 12 inches. Although a conventional
stiffened and strengthened slab-on-grade is designed to
distribute superstructure loads, maximum allowable soil
bearing pressures should not exceed 1,500 psi at any point
Report No. DE-7029 4
under the slab. Sufficient reinforcing should be provided in
the slab and beams to resist concrete shrinkage and cracking
due to bending moments created by some movements in the
foundation soils. The slab design should be based on a
Potential Vertical Rise (PVR) of 1.1 inches.
The interior floor slab with the shallow footings may also be
supported at. grade and designed in accordance with the above
requirements.
Two to four inches of granular material such as coarse sand or
pea gravel are recommended beneath the floor slab to enhance
drainage, to reduce vertical moisture/vapor movement, and to
serve as a leveling course. Additionally, polyethylene
sheeting or equivalent materials should be placed between the
concrete and granular layer to act as a vapor barrier in areas
where floor coverings or coatings are planned or where
moisture penetration is undesirable.
It is recommended that floor slab areas not be structurally
connected to interior columns. Isolation joints should be
placed between the columns and the slab to ensure that any
vertical floor slab movement is not transferred to structural
members.
Sign Foundation
A proposed McDonald's sign will be sub3ected to axial and
lateral loads due to gravity and wind effects. Based on the
soil stratigraphy at the site, we recommend that the proposed
signs be supported on drilled footings (straight shaft)
founded in the very stiff to hard sandy clay of Stratum II.
The straight shaft piers should be proportioned using an
allowable end bearing pressure of 7,500 psf. An allowable
lateral pressure used to resist the horizontal forces and
moment imposed on the pier may be 5,000 psf for the sandy
clays. Lateral resistance in the top four feet of the pier
should be neglected from the calculations.
Corrosion Potential
During wet seasons of the year, underground piping may be
exposed to free moisture in the form of surface saturated
soils or perched water in trench bedding which could cause
metal piping to corrode. Therefore, cathodic protection will
be required~ for metal piping 'or alternately non-corrosive
materials or conventional PVC piping should be specified.
Pavement
The surficial soils at the site consist of silty and clayey
fine sands overylying moderately plastic sandy clays. In
these areas a temporary perched water table may develop. The
perched water could lead to prolonged saturation and reduced
Report No. DE-7029 5
strength of the surficial sands and clay subgrade. It is,
therefore, recommended that flexible asphaltic pavement not be
used and consideration be given to rigid concrete pavement
only.
Based on correlations of subgrade type and supporting
capacity, the required pavement thickness as a function of
estimated traffic and wheel loading for rigid paving has been
determined using the AASHTO "Structural Number" (SN) system.
Listed on Table I of Appendix A are typical pavement sections.
These pavement sections' will be suitable for frequent
applications of the design wheel loading and infrequent loads
of greater magnitude. Adequate subgrade drainage is essential
to pavement performance in accordance with design criteria.
Site Preparation
Site preparation may require minor cuts and fills to bring the
site to desired grades. The fill required to bring the site
to desired grades may consist of on-site soils from cut
sections, free of any vegetation or debris or off-site
inorganic soils with a plasticity index less than 20.
Recommended earthwork construction procedures are included in
Appendix A.
INSPECTION AND TESTING
Many problems can be avoided or solved in the field if proper
inspection and testing services are provided. It is
recommended that site preparation, pavement construction, and
floor slab construction be monitored by a qualified
engineering technician. Density tests should be performed to
verify compaction and moisture content of any earthwork.
Inspection should be performed prior to and during concrete
placement procedures.
LIMITATIONS
The recommendations presented in this report were based on a
discrete number of soil test borings. Although our field
personnel visually survey the site for surface features
indicative of variable soil conditions (fill, borrow, or
drainage areas, faulting, etc..), subsurface conditions may be
encountered that differ from these data. In this case, we
should be notified immediately so that the effects of these
conditions on design and construction can be addressed. AnY
changes in the project character and location, or, substantial
grade changes should be discussed with our firm in order to
assess possible changes in the recommendations.
This study was conducted for the exclusive use of the
McDonald's Corporation. The reproduction of this report or
any part thereof, in plans or other documents supplied to
persons other than the owner, should bear language indicating
Report No. DE-7029 6
that the information contained therein is for general design
purposes only and not for bidding purposes.
We appreciate the opportunity to assist with the design phase
of this - Project. Should you have any questions or need
additional assistance, please call.
Very truly yours,
TERRA-MAR, INC.
Project Engineer ~,o~,, ...... ,..,~
Berry R. Srubbs, P.E. %'~7"~'~%::'It.~'' ' '"
Principal Engineer
Assistance in Data Analyses ~:E~=~*ll
and Report Preparation By: Mark E. Wyatt, E.I.T.
Staff Engineer
APP/BRG/dak
Copies submitted: (7) McDonald's Corporation Mr. John Roper
ILLUSTRATIONS
Plates
Plan of Borings 1
Logs of Borings 2 - 7
Key to Log Terms and Symbols 8
Appendix A - Table I - Pavement Sections
Site Preparation
Report No. DE-7029 7
ILLUSTRATIONS
SANDY LAKE ROAD
1" =/40'
/,-- P~operty line ~6
PLAN OF ~,IN(;S
PLATE 1
~ LOG OF BORING NO.
-"' McDotlaJ. dts Restat.h--arlt PROJECT NO.:
L PROJECt: ~t~ Tap ~. ~d ~dy ~ ~.
~ ~1~ T~ LOCATION: SEE PLATE
~ ~ [ [ SUnF~CE ELEVATmOfl: EX(ST'~G ~0[~ SHE~R
~ . [ [ BOR)~ UETHOD= DRY AUGER 0,0 lO ~,0. FT.
wzO FREE WATER ENCOUNTERED AT __ _ FT. ~ ~ ~ ~ ~ ~ ~ ~O
mj STRATUM CRIPTIO ~ PL Pm
m
5 - ~.~ -l~ter ~ color at ~.5' 1.~
-20'
'50'
SAUPL~ m S~ELBY
LEGEND: Tofl~ ~ STANDARD ~ TEXAS H(GH~AY ROC~ NO COUPLEI)ON DEPTH: 10,0 FT.
PeNEIRAliON DEPT. PEnET. ~ ~ RECOVERY
CORE , DATE: ~1~7
~'~ PLATE 2
2 LOG OF BORING NO. ~,~ z
_~ ~or~ld's Festaurant
,,., PROJECT: Dent(x] Tap ~. ~ ~dy ~ ~. PROJECT NO.: ~7~
= ~p~11~ T~ LOCATION: SEE PLATE
~ SURFACE ELEVATION~ EXISTING SOIL SHEAR
~ - BORI~ METHOD~ DRY AUGER 0.0 TO 5.0 FT,
~ W~H BORE TO FT. ~ ~ ~ ~X ~ :
~ ~__~ F"EE WATER ENC~NTERED AT FT.
OZ
~ ~ WATER AT FT. AFTER HRS. 20
~ HOLE CAVED [ DRY) AT 5.0 FT. AFTER 2~ HRS. Z Z
~ STRATUM DESCRIPTION
3.0 ~ br~ ~yey f~e ~d ~ s~t 0.92
~ d~ at 2.0'
(m)
Ve~ s~f ~ ~ ~y ~dy
5- 2.5 ~) 0.78
~te: ~le ~ at ~leti~.
- I0 -
- 15
~20.
-25-
'30'
SAMPLE ~ SHELBY ~ TEXAS HIGHWAY ROCK
L~G[.D: ~U~[ ~ STANDARU
I
P[NET.A],ON DEPT. P~N~. ~CO"~ ~ RECOV~R~"O COUPL~T,O. DEPTH: 5.0 FT.
I I I J DATE: ~1~7
~-~ PLATE 3
LOG OF BORING NO.
l~23~ld's P~tau~ant
PROJECT: l~ntc~ Tap ~. ~d ~dy ~ ~. PROJECT NO.: ~
~p~ T~ LOCATION: SEE PLATE
~ I SURFACE ELEVATION: EXISTING S01L SHEAR
I BORING METHOD: DRY AUGER 0,0 TOE0.0 FT. ~ ~ ~, ~ STRENGTH
~ I · ~ ~ ~ : TONS/SO.F'
. W~H BORE TO FT. ' ~ ~' ~ ~ O>
O~ ~ I WATER LEVEL O~ERVATIO~: ~ ~ U ~0 Z~ ~ ~Z
~ ~ / STRATUM CRIPTi ~ "~
4.~ {~ br~ c~yey f~e ~d 1.~
1.0 ~St~f br~ ~ ~y ~y ~y 0.31
{-v s~f at 3.~'
5 2.~ 0.~
~ <~)
{d ~ ~d Fay ~dy ~y ~ n~o~ ~ s~
.~o 4.~ . <~) [.~
15'
'20'
'~5'
-50'
SAMPLE ROCK
LEGEND: ~ SHELBY
~ I i I DATE:
~'~ PLATE
LOG Of BORING NO. ~II~
MzDonald's Restaurant
PROJECT: I)entcm Tap Rd. and Sandy lake Rd. PeO.JECT .~O.: ]]g-7029
Coppell, Texas LOCATION: SEE PLATE
~ SurFACE ELEVATION: FXmTING SOIL SHEAR
~ . BORING METHOD: DRY AUGER 0.0 TO 20.0 FT. ~- ~- ~ ~ STRENGTH
,: wASH SORE TO FT. ,~,~ ~ -~ _o~--× { .' i.
..,_: o ~-c~ z~_ ~: mz
~' 0~ WATER LEVEL OBSERVATIONS: ::Dz-- -- Z-
~ FREE WATER ENCOUNTERED AT FT. _
~, ,,=,
? WAT[. AT__ ~T. AFTER __ HRS. O S ~- O"'
<Z HOLE CAVED'( DRY) AT 16.5 FT. AFTER 24 HRS. Z Z ,,~n~ Z'~
: STRATUM DESCRIPTION ~ "'
Median dense red, tan and gray clayey fine sand
1.5 16 23 11 12 ~8 0.47
(sc)
-5 2.5 Very stiff red, tan and gray sandy c~y 18 3.78
-hard at 8.5~
lO-4.5+ 15 32 11 21 119 1.5+1.9~
:3.0 -lncr~ng gray color, very stiff at 13.5' (CL) 16 0.93
~5-Dense tan and gray clayey fine sand
-very de~se at 18.0'
6~ (sc)
-20' Note: Hole dry at completion.
-25-
-30- , ,
SAMPLE SHELBY 10~ STAN[)ARD ~;~ TEXAS HIGHWAY IT~ mOCK [~1 NO COMPLETION DEPTH: 20.0 FT.
L~G~ND: ~ TU[~ I I~ p[Ne~RA]~ON i D~PT. P~N~'r. I "'COR~ I RECOVERY DATE: 4--15--87
T'r~o~ PLATE 5
~rJ)onald's P~staurantLOG Of BORING NO. ~5
~O~ECr: l~tcn Tap ~. ~ ~dy ~ ~. v~oJecr NO.: ~
G~ll, T~ LOCATION: SEE PLATE
~ SURFACE ELEVATION: EXISTING SOIL SHEAR
~ ~ STRENGTH
~ - BORI~ METHOD: DRY AUGER 0.0 TO ~.0 FT, ~ -
~ ~ = > ~ TONS/SQ.F~
. · W~H BORE TO FT.
~ ~_~ WATER LEVEL OmERVATIONS: g~ ~* g -- m~ ~ *o
~ZO FREE WATER ENCOUNTERED AT FT. ~ _ ( ~ (~ ~ ~ ~Z~ ~
ZTM OZ ~ ~ ~m ~ ( &~ Z~
- o
~ HOLE CAVEO ( DRY) AT ~.~ FT. AFTER 2~ HRS. Z Z
= . STRATUM DESCRIPTION ~ .~l .,
1.5 ~ d~ r~ c~yey f~e ~d ~ ~c1~ md 14 0.47
1.~ ~ 17 26 11 15 52 0.~
(~)
5 - n~ ~d
-~O- 3.75 16 35 12 ~ ..16
I
-15 3.0 -~~g ~d c~t~t aL 14.5~ ~8 l~
(&)
Ve~ ~ ~ md ~ay ~yey f~e ~d
· 20.63
~te= ~le ~ at c~let~.
-5o- ,
LEGEND: SAMPLE ~ SHELBYTUBE ' ~ STANDARD ~ TEXAS HIGHWAY ' ~ ROCK ' ~RECOVERyNO COMPLETION DEPTH: ~.OFT.
PENETRA]ION DEPT. PENET. ~ CORE DATE: ~7
I I I
~-~ PLATE
LOG OF BORING NO.
'-' McDonald's Restaurant
PROJECT: Dento~ Tap Rd. and Sandy Lake Rd. PROJECT NO.:I~-7029
= Coppell, Texas LOCATION: SEE PLATE
~ SURFACE ELEVATION: EXISTING SOIL SHEAR
"~ ~C{ BORING mETHOD: DRY AUGER 0.0 TO 5.0 FT.
,,,zO FREE WATER ENCOUNTERED AT FT. -~-
~ Z-~ OZ
= ~.g WATER AT FT. AFTER HRS.
~, .OLE CAVED'( O~Y) AT 4.1 FT. ^~T[R 24 '"S. Z Z O
< STRATUM DESCRIPTION
2.25 Very stif~ ~eddi.~h b~oun sandy clay with occas~ona~ ~z-on 10.70
nedu~es
2.75 3.85
~ Very stiff red, tan and gray sandy clay with nunerous 1.24
4.O
--x_irc~ stains
Note: Hole dry at ccmpleticm.
- lO -
· 18
-RO-
-~8.
-~O'
SA~PtE ~ S~E~¥ ~ TEXAS M~OMWA¥
~SE~D: ~US~ ~ STANDAR~ ~ RECOV£R~ CO~E~ION OE~M:5.0 FT.
~ENE~R~,O~ DE~T. ~NE~. ~CO~E~OC~
~ ~ I I DATE: 4--15--87
~- ~aU"~ PLATE 7
SYMBOLS AND TERMS USED ON BO G LOGS
SAMPLE TYPES
~ .or,.Ea .... '-I ~v ~.*O~DG~vE~S 6.*VE~ INDICATES DE~H OF STANDARD PENETRATION TEST
~[1MIX*URES INDICATES DE~H OF DISTURBED OR AUGER SAMPLE
~.~ ~,.ES, '~1 KEY TO SAMPLES
~ ~c~ ~c,~s~ LIQUID LIMIT
--
~ S,EVE ~ : 10
o
~ ~ - ~ P~STICI~ CHART
SOIL C~SSIFICATION CHART
UNIFIED SOIL CLASSIFICATION SYSTEM
RESTIVE DENSI~ OF COHESlONLESS SOILS CONSISTENCY OF COHESIVE SOILS
COARSE G~INED SOILS (major potion retained on No. 2~ FINE GRAINED SOILS (major potion passing No. 2~ sie~):
sieve): Includes (1) clean grovels and sands, and (2) silty or Includes (1) inorganic and organic silts and clays, (2) gravelly,
clayey gravels and sands. Conditions rated ac~rding to stan- sandy, or silty clays, and (3) clayey silts. Consistency is rat~
dard penetration test (S~ as pedormed in the field, according to shearing strength as Indicated by penetrometer
readings or by unconfined compression tests.
Desc~ptive Te~ Blows Per F~t*
Unconlin~
Ve~ L~se 0 - 4 Compressive
Loose 5 - 10 DescHpti~e Te~ Strength
Firm 11 - 30 To. Sq. FL
Dense 31 - ~
Ve~ Dense over ~ Ve~ Soft Less than 0.25
Soft 0.25 to 0.~
'1~ pound weight having a frae fall of ~ inches. Medium 0.~ to 1.~
Stiff 1.~ to 2.~
Ve~ Stiff 2.~ to 4.~
Hard 4.~ and higher
NOTE: Slickensided and fissured clays may have lower um
confined compressive strengths than shown above, because
of weakness or cracks in the soil. The consistency ratings of
such soils are based on penetrometer readings.
TERMS CHARACTERIZING SOIL STRUCTURE
Slickensided -- having inclined planes of weakness that are slick and glossy in appearance.
Fissur~ -- containing shrinkage cracks, frequently fill~ with fine sand or silt; usually more or less vertical.
~minated -- composed of thin layers of vayng colors and texture.
Inter~dded ~ composed of alternate layers of different soil ty~s
Calcareous ~ containing appreciable quantities of calcium car~nate
Well graded -- having wide range in grain sizes and substantial amounts of all intermediate panicle sizes.
P~rly graded -- predominantly of one groin size, or having a range of sizes with some interm~iate size missing.
l'EratA-~ PLATE 8
APPENDIX A
TABLE I - PAVEMENT SECTIONS
Rigid Pavement (Protected Corner)
Pavement Thickness, inches
Auto Service Drive
Traffic Truck Traffic
Concrete Pavement: 5.0" 6.0"
Scarified and Compacted to 95% 6.0" 6.0"
Compacted Subgrade: Standard Density
ASTM D-698 at +1
to +4 percentage
points of optimum
moisture
(a) Auto parking areas to be reinforced with #3 bars at 24 inches
on-center and truck drives at 18 inches on-center or flat
sheets of welded wire mesh 6 x 6 - 6/6 and 6 x 6 - 4/4,
respectively. Specifications should require a minimum clear
distance of 2 inches between the soil and steel. Strength of
concrete should be 3,000 psi at 28 days. Recommended 3oint
spacing is 20 to 25 feet.
(b) Heavy traffic areas such as truck unloading and garbage
truck zones, should be reinforced with #3 bars at 12 inches
on-center each direction. Strength and clear distance to
reinforcement should be as above.
Referenced Specifications
Texas Highway Department Standard Specifications
(THD S.S.):
Item 200 - Site Stripping.
Item 216 - Proofrolling.
SITE PREPARATION
The recommended earthwork construction procedures are .as
follows:
1. Remove all vegetation, organic topsoil and any
undesirable materials from the construction area.
Average stripping depth is estimated to be six inches.
2. Structural pavement and fill areas should then be
proofrolled with a loaded dump truck, scraper, or similar
pneumatic-tired equipment. The proofrolling serves to
densify loose surficial soils and to detect any soft or
loose zones. Any soils deflecting excessively under
moving load should be undercut to fi£., soils and
recompacted. The proofrolling operations should be
observed by an experienced geotechnician.
3. Scarify the subgrade, add moisture if necessary and
recompact to 95 percent of the maximum dry density as
determined by ASTM D-698 (Standard Proctor). The
moisture content at the time of compaction of subgrade
soils should be from plus one to plus four percentage
points above the proctor optimum value.
4. Fill may consist of on-site soils or off-site inorganic
soils with a plasticity index less than 20 and should be
placed in loose lifts not exceeding nine inches in
thickness and compacted to 95 percent of the maximum dry
density determined by ASTM D-698 (Standard Proctor). The
moisture content of the fill at the time of compaction
should be from plus one to plus four percentage points
above the proctor optimum value.
5. In cut areas, the soil should be excavated to grade and
the surface soil proofrolled and scarified to a minimum
depth of six inches and recompacted to the previously
mentioned density and moisture content.
6. The subgrade moisture content and density must be