Loading...
WA9302-LR 951108['EOTECHNICALE IGEE Consultants, Inc. E iNVIRON~ENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 8, 1995 Date Concrete Placed: October 30, 1995 Standara 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank Concrete Report No.: 40 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Piers MATERIALS ~o~, ~h ,~. INSPECTION DATA Description (Lbs./Cu. Yd) Mix Number: 686 Time Sample Batebed: 8:57 am Cement: Time Sampled: 9:30 am Sarapie Location: Pier No. N-4 Fly Ash: Truck/Ticket No: 196/13614 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 55°F Fine Aggregate: Concrete Range: 58°F Slump Range (inches): 51/2 Admixtures: Weather Conditions: Rain 1 Time Started: 2 Time Completed: Added Water: 8 gal. Sample Air Content (%): No Test Total Cubic Yards Phced: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total Load Compressire Strength Remarks Number Slump (in.) (Days) Tested (Lb8.) (Lbs./Sq. In.) CWT 161 51/2" 7 11/06/95 137,660 4,870 CWT 162 5~h" 7 11/06/95 152,860 5,410 CWT 163 5~h" 28 11/27/95 CWT 164 5~/~" 28 11/27/95 Test Methods Utilized Fracture Regular Cylinders Made By: P. Chen ASTM C-31,C-39,C-143 COnless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - ShimeL lacobs and Finklea Mr. Gary Herron - RediMix Concrete d~.&' GEE Consultants, Inc. Reviewed by: