ST9304-CS010426 Railroad Controls Limited Comprehensive Signal.& Communication Services
April 26, 2001
Mr. Glenn D. Hollowell P.E. /_~' '4J~R ~
Assistant Director Public Works ~. Received
City of'Coppell \~ Dallas County
Co ppell, TX 75019 "~'z'
RE: Belt line Road ImproYements Project
Fort Worth & Western Railroad Cro-~$ings at:
Moore Road - Del No. 780 ?SOS
Mockingbird Lane - Del No. 788 ?$'~ B
MacArthur Boulevard - Del No. 700 206B
Dear Mr. Hollowell:
We have completed estimates for modifications to the above listed crossings in conjunction with
the Belt kine Road widening Droject. As discussed, existing control equipment at. each of the
three crossings does not allow for traffic Signal interconnect with advance preemption
capabilities. If the City determines that advance preemption is needed at each of the crossings,
all new control equipment must be installed with costs estimated as follows:
Moore Road $120,000
Mockingbird lane $120,000
MacArthur Boulevard $150,000
lotal Project Estimate $300,000
If advance preemption is not required, the estimated cost for installing new side Ii§his to face
Belt kine Road would bO $7,500 per location for a total of $22,800.
The above estimates do not include Cost for relocation of existing gates or cantilevers.
If you have any questions, please give me a call at (817) 820-6307.
Sincerely,
Railroad Controls Limited
Scott C. Booker, P.F.
Prelect Engineer
SGB
cc: Jim Martin, FWVVR