Loading...
ST9304-CS010426 Railroad Controls Limited Comprehensive Signal.& Communication Services April 26, 2001 Mr. Glenn D. Hollowell P.E. /_~' '4J~R ~ Assistant Director Public Works ~. Received City of'Coppell \~ Dallas County Co ppell, TX 75019 "~'z' RE: Belt line Road ImproYements Project Fort Worth & Western Railroad Cro-~$ings at: Moore Road - Del No. 780 ?SOS Mockingbird Lane - Del No. 788 ?$'~ B MacArthur Boulevard - Del No. 700 206B Dear Mr. Hollowell: We have completed estimates for modifications to the above listed crossings in conjunction with the Belt kine Road widening Droject. As discussed, existing control equipment at. each of the three crossings does not allow for traffic Signal interconnect with advance preemption capabilities. If the City determines that advance preemption is needed at each of the crossings, all new control equipment must be installed with costs estimated as follows: Moore Road $120,000 Mockingbird lane $120,000 MacArthur Boulevard $150,000 lotal Project Estimate $300,000 If advance preemption is not required, the estimated cost for installing new side Ii§his to face Belt kine Road would bO $7,500 per location for a total of $22,800. The above estimates do not include Cost for relocation of existing gates or cantilevers. If you have any questions, please give me a call at (817) 820-6307. Sincerely, Railroad Controls Limited Scott C. Booker, P.F. Prelect Engineer SGB cc: Jim Martin, FWVVR Jan Seidner, DART John Mears, Dallas County RCL File C9881A,B,C 500 South Freeway · Fort Wofuh, TX 76104-3504 · 817-820-6300, Fax 817-820-6340