Loading...
First United-CS010710 DOWDEY, ANDERSON AND ASSOCIATES, INC. CIVIL ENGINEERS .5225 VILLAGE CREEK DRIVE SUITE 200 PLANO, TEXAS 75093 (g72) g31-0694 FAX (972) g31-g538 07-10-01Al1:17 RCVD July 10, 2001 Mr. Ken Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas, 75019 Re: First United Methodist Church, Second Addition Construction Plan Review Comments DAA .Job No. 96081 Dear Mr. Griffin: Per your letter dated June 28, 2001, the following comments have been addressed: 1. I have reviewed our Field Notes and found the elevation to be correct. The elevation is shown on the Final Survey of the existing parking lot. A copy of the Survey Plat is enclosed. 2. Bill Anderson will meet with the congregation this week to see if they care to put in the water service to the future building at this time. I am sending the following items as requested for further review: 2 - Sets of Revised Construction Plans 1 - Set City Markups 1 - 24x36 Blackline copy Final Survey, West Parking Lot If you have any questions, please do not hesitate to call me. Leo Lozano P:\Skelton\word\1996\96081 ltrgriffin csprev.doc