Loading...
WA9302-LR 951108 (4) " [~'EOTECHNICAL E GEE Consultants, Inc. E I NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: November 8, 1995 Date Concrete Placed: October 26, 1995 stanc~r~ 6"x12" Client: City of Coppell Area 28.27 Square Inches Project: 6.0 Million Gallon Water Storage Tank concrete Report No.: 38 Contractor: Natgun Construction Project No.: 95-0196 Concrete Supplier and Plant: RediMix Concrete - Plant #1 Location of Placement: Piers MATERIALS ~on~' ~h ~. INSPECTION DATA Description (lbs./Cu.Yd.) Mix Number: 686 Time Sample Batehe& 9:20 am Cement: Time Sampled: 10:20 am Fly Ash: Sample Location: Pier No. K-7 Truck/Ticket No: 195/13404 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 68°F Fine Aggregate: Concrete Range: 67°F Admixtures: Slump Range (inches): 5V2 Weather Conditions: Sunny 1 Time Started: 2 Time Completed: Added Water: 5 gal. Sample Air Content (%): No Test Total Cubic Yards Placed: 7.75 C.Y. Required Strength (Lbs./sq.in.): 4,000 Specimen Measured Age Date Total L~d Compressive Strength Remarks Number Slump ('m.) (Days) Tested (Lbs.) CLbs./Sq. In.) CWT 153 5%" 7 11/02/95 120,440 4,260 CWT 154 5~h" 7 11/02/95 126,220 4,460 CWT 155 5%" 28 11/23/95 CWT 156 5%" 28 11/23/95 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Othenvise) Cylh~ders Made By: P. Chen Remarks and]or Distribution: ce: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea Mr. Gary Herron - RediMix Concrete GIR Coneultents, Inc. Reviewed