Nash Manor-CS010724T H E C I T Y 0 F
Hi ,:S - t
July 24, 2001
Bryan Powell
Jones & Carter, Inc. Consulting Engineers
12000 Ford Road, Suite 180
Dallas, TX 75234
Nash Manor
Construction Plan Review Comments
Dear Mr. Powell:
The City of Coppell has received and reviewed the revised plans and
comments to offer:
1. On Sheet 8, you should note the angle of deflection for the water line at ~
When the plans are resubmitted, need to insure minimum 10' separatio:
and sanitary sewer lines to Lots 2, 3 and 5.
2. On Sheet 10, it appears that you changed the FHA lot grading plan on
Lot 2. Based on your Drainage Area map, Lot 1 should be a Type C Fi
Lot 2 should be a Type A FHA grading plan.
Once the above changes have been made, please submit three sets of r{
City's use and as many copies for your use as necessary. Prior to final app]
plans, all development fees and construction inspection fees should be
construction inspection fees, a copy of the cost of the work should be provi&
inspection fee is calculated as 4% of the value of the work performed in the
and 2% of the value of the work that is private. On this particular subdi'
work will be calculated at 4% with the exception of the grading and filling o
be calculated at 2%. If you have any questions, please contact me at (972) 31
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering & Public Works
255 PARKWAY lit P.O,BOX 478
has the following
tpproximately 2+30.
between the water
,ot 1 as opposed to
IA grading plan and
vised plans for the
~val of construction
~aid. To verify the
t. The construction
public fight-of-way,
dsion, it appears all
a Lots 1-6. That will
)4-3686.
Fax Note 7671 Dat~l/2.t~/O/ IP~a~re'' (
COPPELL TX 75019 ,A' TEL 972/46:> 0022 ~' 'AX 972/304 3673