Nash Manor-CS010719 JONES& CARTER, INC.
Consulting Eng. i~wers
12000 Ford Road, Suite 180 972/488-3880
Dallas, Texas 75234 Fax 972/488-3882
July 19, 2001
Mr. Kenneth M. Griffin, P.E.
Director of Engineering & Public Works
City of Coppell
255 Parkway
Coppell, Texas 75019
Re'
Nash Manor
Construction Plan Review Comments
Dear Kenneth:
The following statements are in response to your plan review comments dated July
1. Lot 2 has been revised to drain to Nash. Drainage calculations have been
2. The proposed 2" blow off& box has been relocated outside of the propose
3. The note has been revised to read sheet 8.
4. The note has been revised to read, "the entire fire hydrant must be painted
5. The note has been revised to read, "12 gauge copper wire with blue insular
6. The existing pond is not a wetland. Documentation will be provided for th
7. The FHA lot grading on lot 2 has been revised, c-~r~-~,c,~ [,~ ]
o
We have extended an 18" RCP storm line with a Type "Y" Inlet to accon
the property to the south of our development. Back lot and side lot swale:
convey the remaining flows inside and outside the development. We
swale detail to assist the contractor in installing the swales. Property own
permission obtained if any offsite grading is necessary.
9, 2001.
~dated.
driveway.
ellow."
on."
is.
tmodate drainage from
', will be constructed to
lave added a standard
:rs will be notified and
Mr. Kenneth M. Griffin, P.E.
Page 2
July 19, 2001
The original set of marked plans is enclosed along with two revised sets for your r~
you have any questions, please call.
BPP/bpp
G:LPROJECTSXJRHOLDINGS/D004/LETYERS/CITYREVIEW2
Sincerely,
Bryan P. Powell
Enclosures
~view and approval. If