Loading...
Nash Manor-CS010710 T H ~' C I T Y 0 F COI5' EI L Bry~ Powell Jones & C~er, Inc. Consult~t Engineers 12000 Ford Road Suite 180 Dallas, Tex~ 75234 N~h M~or Fee Assessment Letter Park Development Zone: Zone 2 Mr. Powell FIL July 1 O, 2001 Enclosed is a copy of the City of Coppell Development Fee Assessment t~;ble, along with a copy of the Development Fee calculations for the referenced developme~tt. Please make payment for the Impact Fees to the City of Coppell in the amount of $18,240.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed ,fees that need ':o be paid prior to Council approval. Also provide a copy of the Engineer s estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center 732 Deforest. Meters will be ordered when these fees are paid. Appropriate payment of the required fees will help insure a successful be ginning of this' project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer cc: Jennifer Armstrong, Finance Director Rhonda Brothers, Engineering Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services 255 PARKWAY llr P O BOX 478 'k COPPELL TX 75019 1Ir TEL 972/462 0022 ~' FA 972/304 3673 DEVELOPMENT FEE WORKSHEEt PROJECT: Nash Manor DATE: 7/10/2001 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 6-5/8inchX3~inch = 6 ESU'~ 0 = 0 ESU'~ 0 = 0 ESU'I 0 = 0 ESU'I Total #: 6 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 6 Domestic Meter(s) @ $26.57 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 6 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 6 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 6 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Page 1 $2,700.00 $300.00 $159.42 $0.00 $0.00 $0.00 $210.00 $0.00 $2,700.00 $300.00 $300.00 DEVELOPMENT FEE WORKSHEI=T Preliminary plat approved: After October 26, 1993 Park Development Zone: 6 Single-family @ $1,285.00 per lot 0 Multi-family @ $1,285.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 Zone 2 $7,710.00 $0.00 $5,130.00 Information not Available Information not Available Information not Available DEVELOPMENT FEE TABLE Project: Nash Manor Date: 7/lO/2O01 TOTAL A MOUNT DUE FEES DUE PRIOR TO COUNCIL ~.PPROVAL Water Impact Fee $2,700.00 $2,700.00 (100% due prior to Council Approval) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $159.42 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $210.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,700.00 $2,700.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $300.00 (100% due at Iss~_~_ar~ce of Building Permit) Utility Final Inspection Fee $300.00 (100% due at Iss~rtce of Building Permit) Park Fee $7,710.00 $7,710.00 (100% due prior to Council Approval) Roadway Impact Fee $5,130.00 $5,130.00 (100% due prior to Council Approval) Street Light Fee Information not Availab (100% due prior to Acceptance of Project Street Sign Fee Information not Availab [e (100% due prior to Acceptance of Project Construction Inspection Fee Information not Availab te ,Il TOTAL $19,509.42 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $18,240.00 I ROAD v~AY IMPACT FEE CALCULA~I tONS PROJECT: Nash Manor DATE: 7/10/2001 ROADWAY IMPACT FEE: Service Area * Cate$ory ** Land Use ** No. Lots/Units Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x iVehicle Miles per Development Unit) x (Fee per Vehicle Mile) = 6 Residential ~ed Sin$1e-Family Detac 6 6.00 2.85 $300 * (Figure 2 - Roadway Irc ** (Table 3 - Roadway Irt *** (Schedule 2, Page 3 - Roadway Irc AMOUNT DUE: $5,130.00 ~act Fee Study) ~act Fee Study) ~act Fee Study) $5,130.001