Loading...
Nash Manor-CS010515 T H E C I T Y 0 F' COPPELL May l5,2001 Brian Powell Jones & Carter, Inc. 12000 Ford Road, Suite 180 Dallas,Texas 75234 RE: Nash Manor Construction Plan Review Comments Dear Mr. Powell: The City of Coppell has reviewed the referenced plans and has the following 1. Provide a copy of the plat with the Construction Plans. 2. At a minimum the existing pond should be drained, dredged and filled which should be compacted to 95% standard proctor. Each lift sh approved geotechnical testing lab. 3. Typically a 10 minute "Time of Concentration" is used for drainage c anything other than 10 minute, additional calculations must be prov time of concentration. 4. On the Paving Plan and on the Water & Sanitary Sewer Plan, show th of all driveways to ensure there will be no conflicts with proposed impr, 5. The typical width of a residential street is 28 feet. 6. Make correction to the Paving & Drainage construction notes as indicat, 7. Show the location of the proposed 8" water line measured from the righ 8. There is a concern regarding the location of the proposed 8" water lix conflicts with existing trees. A suggestion, which would need to be re Carter, Inc., is to locate the proposed storm drainage system along thc Manor. This could allow the proposed 8" water line to be located cl street. 9. The proposed water line should be extended straight to the back of the around the cul-de-sac (Sheet 4). 10. Make changes to the Water Line construction notes as shown on Sheet 11. All public fire hydrants must be painted yellow. 12. The typical radius for cul-de-sac paving is 39' with a 6" crown. 255 PARKWAY ~ P.O.BOX 478 ~ COPPELL TX 75019 ~ TEL 972/462 0022 omments to offer: n maximum 8" lifts dl be tested by an flculations. If using ded supporting the proposed location vements. ,~d on Sheet 3. :-of-way. te and the potential viewed by Jones & :west side of Nash )ser to the existing ul-de-sac instead of F~X 972/304 3673 13. Show the dimension of the proposed storm sewer system measured fr line. 14. The depth of existing inlet, which the proposed storm system is corm verified. 15. If a high point is needed in the water line as proposed, then it needs to hydrant lead. 16. The proposed stabilized construction entrance must be located on lq not in the right-of-way. 17. Indicate which F.H.A. lot grading type is proposed for each lot. Also p F.H.A. type. 18. There is a concern on how the drainage from the south will be col development. 19. Fences are typically located on property lines therefore it would 1~ drainage to occur if fences are in the middle of the proposed swale. PI~ There are various other minor comments throughout the plans. When all c addressed, please return these marked plans and two sets of revised pi review. If you have any questions, please contact me at (972) 304-3681. Sincerely, : Mic'h'ael A. Martin, P.E. Assistant City Engineer >m the right-of-way :cting to, should be ~e located near a fire tsh Manor property, ~ovide detail of each ~veyed through this e very difficult for ase address. omments have been aris to the City for