Loading...
Nash Manor-CS010410 Consulting Engineers 12000 Ford Road, Suite 180 972/488-3880 Dallas, Texas 75254 Fax 972/488-J882 $4-1 0- April 10, 2001 Mr. Mike Martin City of Coppell Engineering Department 255 Parkway Boulevard Coppell, TX 75019 Re: Construction Plan Review for Nash Manor Dear Mike: Enclosed are two (2) sets of construction plans for your review and comment. The. for the design of water, sanitary, paving and drainage facilities to serve the Nash M~ When reviewing, please reference the engineering documents submitted to~ Engineering Department from Jones & Carter, Inc. dated January 25,2001, regardit line analysis of the existing Sandy Lake Road storm sewer system along with t Reconstruction Plans prepared by Kimley-Hom a_n_d Associates. Sheets 82 and hydraulic data and overall storm sewer system layout. Sheets 51-56 provided s profiles. This information was used in the design of the proposed storm sewer syst¢ If you have any questions, please do not hesitate to call our office. onstruction plans are tnor development. :he City of Coppell .g the hydraulic grade ae Sandy Lake Road 55 were used for the torm sewer plan and m. Bryan P. Powell BPP/bpp G:\proj ects\jrholding\D004\letters\constsub Enclosure